Graco 311511G Ground System, Iso Pump Lubrication System Setup, Fluid Supply Connections

Page 17

Ground System

Reactor: is grounded through power cord; see page 15.

Spray gun: connect whip hose ground wire to FTS; see page 18. Do not disconnect wire or spray with- out whip hose.

Fluid supply containers: follow your local code.

Object being sprayed: follow your local code.

Solvent pails used when flushing: follow your local code. Use only metal pails that are conductive. Place them on a grounded surface. Do no place pail on a nonconductive surface, such as paper or cardboard, which interrupts grounding continuity.

To maintain grounding continuity when flushing or relieving pressure, hold a metal part of spray gun firmly to the side of a grounded metal pail, then trigger gun.

Iso Pump Lubrication System Setup

Prepare isocyanate pump lubrication system as follows:

1.Lift lubricant reservoir out of bracket and remove reservoir from cap.

2.Fill reservoir 3/4 full with TSL; see Accessories section in manual 311512.

3.Thread reservoir onto cap assembly and place it into bracket.

The lubrication system is now ready for operation; no priming is required.

Fluid Supply Connections

Connect material supply to inlets of proportioning unit as follows:

1.Ensure the A- and B- inlet ball valves (U,X) on proportioning unit are closed.

Setup

2.Connect and tighten B- supply hose (J) to 3/4 NPT swivel fitting (GG) on B- inlet ball valve (U), and to resin transfer pump.

U

J

GG ti8451a

3.Connect and tighten A- supply hose (BB) to 1/2 NPT swivel fitting (FF) on A- inlet ball valve (X), and to isocyanate transfer pump. See FIG. 3, page 10.

Air Supply Connection

Connect main air supply (F) to air inlet fitting (DD) at air filter (S). Hose fitting requires a 3/8 NPT female fitting.

Use a minimum of 3/8 in. ID air line (not supplied) to deliver air supply to proportioning unit. Use 1/2 in. ID hose if over 15 ft long.The main air supply must be clean and free of oil and contaminants.

DD

F

S

ti8456a

311511G

17

Image 17 Contents
Reactor A-20 Related Manuals ContentsProportioner 50 ft 15 m 10 ft 3 m SystemsPart ApprovalsElectric Shock Hazard Fire and Explosion Hazard Moving Parts Hazard Key for FIG Typical Installation, without CirculationTypical Installation, with Circulation Foam Self-Ignition Moisture Sensitivity of IsocyanatesIsocyanate Hazard Keep Components a and B SeparateComponent Identification Typical InstallationKey AP Park/Run Switch Controls and IndicatorsFlushing Pressure Relief ProcedureLocate Reactor A-20 Electrical Requirements SetupDetermine Power Source Step One Connect Electrical Cord Configure to Supply PowerTerminal Blocks Power Jumper LocationGround System Iso Pump Lubrication System SetupFluid Supply Connections Air Supply ConnectionConnect FTS and Heated Dual Whip Hose Connect Heated Hose Recirculation / Pressure Relief LinesPressure Check Hose Close Gun Fluid Manifold Valves a and BConnect Whip Hose to Gun Fluid Manifold Load Fluid with Feed Pumps Fluid Temperature Sensor FTS CalibrationInitial Startup A1 A2 A3 Digital Temperature ControllersTo change or enter the set point, proceed as follows To change back to Fahrenheit units To change to Celsius unitsHose Heat Manual Mode Over Temperature AlarmsFluid Heater Temperature Offset Supply Wet-Cups with Throat Seal Liquid Spray Spraying SetupSpray Adjustments Shutdown Operation Daily Start-up ProcedureTi2414A Circulation Through Reactor Fluid CirculationCKN Circulation Through Gun ManifoldMaintenance Category Data Technical DataTechnical Data 311511G Graco Information Graco Standard Warranty
Related manuals
Manual 36 pages 59.71 Kb