Sterling operating instructions SSV 05/2R For your safety

Page 10

SSV 05/2R

1.3. For your safety

The operators of this unit must be at least 16 years old.

Before initial operation, read this operating manual carefully. Observe all points. Inquire in case of uncertainties.

This will avoid danger to persons and damage of material!

Store this operating manual in such a way that it is always available on the site of operation for the unit. Faulty operation may lead to accidents!

Note that, for reasons of clarity, not every possible case of operation or mainte- nance can be mentioned.

Note the instructions for safety and the danger signs on the unit. This will avoid danger to persons and damage of material!

All work on the unit may only be carried out by persons whose qualification corre- sponds with the individual chapters of the operating manual.

Faulty operation may lead to accidents!

For all types of work on the unit, proper working clothes must be worn. This will avoid danger to persons!

Compare the connected loads to those of the mains supply. Danger of electrical shock!

When using lifting gear, observe the specific instructions.

Danger of accidents!

Observe the local regulations and requirements concerning the plant.

Interrupt the mains supply for all types of work on electrical components. Danger to life due to electrical shock!

SM4-610

Safety instructions 9

Image 10
Contents Operating Instructions Single Conveyor Unit SSV 05/2R Sterling Material ProcessingSSV 05/2R Sterling Material Processing Technical serviceEdition 08/99 SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description Control and maintenance unit SSV 05/2R Method of functioningSet-up Setting the mixing ratio of the components SSV 05/2R PreparationsFilling level too low Filling level too highSet-up Maintenance SSV 05/2R Maintenance intervals SSV 05/2R Cleaning/replacing the filter cartridge DisassemblySSV 05/2R Assembly Adjusting the level probeSSV 05/2R Trouble-shooting Problem Remedy Test stepsTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation