Sterling operating instructions SSV 05/2R General information

Page 15

SM4-610

SSV 05/2R

2.1. General information

Unpack all parts of the single conveyor unit and make sure that everything is available:

conveyor hopper with level probe (1)

control and maintenance unit (2)

2 x injector tube (3)

2 x supply hose (4) with 4 hose clamps

compressed-air hose

operating instructions

4

1

3

0

1 2

Installation instructions 14

Image 15
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSV 05/2RTechnical service SSV 05/2R Sterling Material ProcessingEdition 08/99 SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description SSV 05/2R Method of functioning Control and maintenance unitSet-up SSV 05/2R Preparations Setting the mixing ratio of the componentsFilling level too high Filling level too lowSet-up Maintenance SSV 05/2R Maintenance intervals Disassembly SSV 05/2R Cleaning/replacing the filter cartridgeAdjusting the level probe SSV 05/2R AssemblyTest steps SSV 05/2R Trouble-shooting Problem RemedyTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation