1.2. Explanations and information

Various terms and designations are used frequently in these operating instruc- tions to ensure clarity. Therefore please note that the terms used in the text stand for the corresponding explanations listed below.

Equipment

”Equipment” can mean an individual unit, a machine or an installation.

Operating personnel

The ”operating personnel” are persons operating the equipment on their own re- sponsibility or according to instructions (minimum age: 16).

Operator

The ”operator” of the equipment (production manager, foreman, etc.) is the per- son responsible for all production sequences. The operator instructs the operat- ing personnel of what is to be done.

Operating instructions

The ”plant operating instructions” describe the interaction of the equipment, pro- duction sequences or methods. The plant operating instructions must be com- piled by the operator of the equipment.

Equipment foreman

When several operating personnel work on one machine, the ”equipment fore- man” coordinates the sequences. The equipment foreman must be appointed by the operator.

Trained personnel

”Trained personnel” are persons who, due to their training, are authorized to carry out the required work in good practice.

SM4-610

Safety instructions 8

Image 9
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSV 05/2RTechnical service SSV 05/2R Sterling Material ProcessingEdition 08/99 SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description SSV 05/2R Method of functioning Control and maintenance unitSet-up SSV 05/2R Preparations Setting the mixing ratio of the componentsFilling level too high Filling level too lowSet-up Maintenance SSV 05/2R Maintenance intervals Disassembly SSV 05/2R Cleaning/replacing the filter cartridgeAdjusting the level probe SSV 05/2R AssemblyTest steps SSV 05/2R Trouble-shooting Problem RemedyTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation