2. Installation instructions

»

These installation instructions are intended for persons with skills in electrical and mechanical areas due to their training, ex- perience and received instructions.

Personnel using these installation instructions must be in- structed in the regulations for the prevention of accidents, the operating conditions and safety regulations and their implemen- tation.

Ensure in each case that the personnel are informed.

The installation instructions provided in the corresponding oper- ating instructions apply for all connected equipment.

Observe safety regulations with regard to lifting gear handling. All installation work must be carried out with the equipment disconnected from electrical power and compressed air supply.

L

For installation work taking place at heights of over approx. 1829 mm. (6 ft), use only ladders or similar equipment and working platforms intended for this purpose. At greater heights, the proper equipment for protection against falling must be worn.

Use only suitable lifting gear which is in proper working order and load suspension devices with sufficient carrying capac- ity. Do not stand or work under suspended loads!

Use suitable workshop equipment.

F

SM4-610

Install the equipment such that all parts are easily accessi- ble; this facilitates maintenance and repair work.

Installation instructions 13

Image 14
Contents Operating Instructions Single Conveyor Unit SSV 05/2R Sterling Material ProcessingEdition 08/99 Technical serviceSSV 05/2R Sterling Material Processing SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description Control and maintenance unit SSV 05/2R Method of functioningSet-up Setting the mixing ratio of the components SSV 05/2R PreparationsFilling level too low Filling level too highSet-up Maintenance SSV 05/2R Maintenance intervals SSV 05/2R Cleaning/replacing the filter cartridge DisassemblySSV 05/2R Assembly Adjusting the level probeSSV 05/2R Trouble-shooting Problem Remedy Test stepsTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation