Sterling SSV 05/2R operating instructions Set-up

Page 22

SSV 05/2R

4. Set-up

»

This chapter is intended for the operating personnel of the equipment.

General knowledge of operating conveyor units is prerequisite.

The functional description must have been read and under- stood.

Ensure in each case that the operating personnel are sufficiently informed.

SM4-610

Set-up 21

Image 22
Contents Operating Instructions Single Conveyor Unit SSV 05/2R Sterling Material ProcessingSSV 05/2R Sterling Material Processing Technical serviceEdition 08/99 SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description Control and maintenance unit SSV 05/2R Method of functioningSet-up Setting the mixing ratio of the components SSV 05/2R PreparationsFilling level too low Filling level too highSet-up Maintenance SSV 05/2R Maintenance intervals SSV 05/2R Cleaning/replacing the filter cartridge DisassemblySSV 05/2R Assembly Adjusting the level probeSSV 05/2R Trouble-shooting Problem Remedy Test stepsTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation