Sterling operating instructions SSV 05/2R Electrical connection

Page 19

SSV 05/2R

2.5. Electrical connection

»

Observe the regulations of the local electricity board.

The operating voltage is 230 V, AC, PE, 50/60 Hz.

Special voltages available on request.

The connected load is approx. 15 W.

The connection takes place by means of a mains connector.

Aseparate protection of the socket is not necessary. Connect the plug of the probe cable to the control unit. Plug the mains connector into a corresponding socket.

SM4-610

Installation instructions 18

Image 19
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSV 05/2RSSV 05/2R Sterling Material Processing Technical serviceEdition 08/99 SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description SSV 05/2R Method of functioning Control and maintenance unitSet-up SSV 05/2R Preparations Setting the mixing ratio of the componentsFilling level too high Filling level too lowSet-up Maintenance SSV 05/2R Maintenance intervals Disassembly SSV 05/2R Cleaning/replacing the filter cartridgeAdjusting the level probe SSV 05/2R AssemblyTest steps SSV 05/2R Trouble-shooting Problem RemedyTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation