4.1. Preparations

Check whether the injector tubes are inserted in the material to be conveyed.

Switch on the compressed-air supply.

Switch on the conveyor unit at the control and maintenance unit.

The conveyor unit should now convey until the conveyor hopper is filled up to the level probe.

4.2. Setting the mixing ratio of the components

The mixing ratio of the components is adjusted on the pressure reducers.

&

The adjustment on the pressure reducers will vary according to the material, flow properties, particle size and conveying distance.

SM4-610

Set-up 22

Image 23
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSV 05/2REdition 08/99 Technical serviceSSV 05/2R Sterling Material Processing SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description SSV 05/2R Method of functioning Control and maintenance unitSet-up SSV 05/2R Preparations Setting the mixing ratio of the componentsFilling level too high Filling level too lowSet-up Maintenance SSV 05/2R Maintenance intervals Disassembly SSV 05/2R Cleaning/replacing the filter cartridgeAdjusting the level probe SSV 05/2R AssemblyTest steps SSV 05/2R Trouble-shooting Problem RemedyTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation