Sterling SSV 05/2R operating instructions Maintenance intervals

Page 28

 

SSV 05/2R

5.1. Maintenance intervals

daily:

Check the setting of the pressure reducer.

 

Empty the water separator.

Check the danger signs on the unit for legibility

 

and completeness.

monthly:

Clean the filter and sieve

 

(depending on accumulation of dust!).

 

Blow out the filter from the inside out by means

 

of compressed air.

Check the unit plugs for proper functioning.

every six months:

Check all electrical and mechanical connections

 

for proper fit.

Replace the filter and the sieve

(depending on accumulation of dust!).

F

The given maintenance intervals are average values.

Check whether in your individual case the maintenance in- tervals must be shortened.

SM4-610

Maintenance 27

Image 28
Contents Operating Instructions Single Conveyor Unit SSV 05/2R Sterling Material ProcessingSSV 05/2R Sterling Material Processing Technical serviceEdition 08/99 SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description Control and maintenance unit SSV 05/2R Method of functioningSet-up Setting the mixing ratio of the components SSV 05/2R PreparationsFilling level too low Filling level too highSet-up Maintenance SSV 05/2R Maintenance intervals SSV 05/2R Cleaning/replacing the filter cartridge DisassemblySSV 05/2R Assembly Adjusting the level probeSSV 05/2R Trouble-shooting Problem Remedy Test stepsTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation