Attachments which are not delivered by Sterling must be constructed according to the safety standard EN 294. Danger of accidents!

Check all lines, hoses and coupling pieces in regular intervals for leakages and damage. Any errors must be eliminated immediately.

Danger of accidents!

Before beginning maintenance work, set all compressed-air lines on the unit at zero pressure. Danger of accidents!

The unit may only be operated if all corresponding components have been prop- erly connected and are in accordance with the relevant regulations.

Observe the safety instructions for the connected units.

SM4-610

Safety instructions 11

Image 12
Contents Operating Instructions Single Conveyor Unit SSV 05/2R Sterling Material ProcessingTechnical service SSV 05/2R Sterling Material ProcessingEdition 08/99 SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description Control and maintenance unit SSV 05/2R Method of functioningSet-up Setting the mixing ratio of the components SSV 05/2R PreparationsFilling level too low Filling level too highSet-up Maintenance SSV 05/2R Maintenance intervals SSV 05/2R Cleaning/replacing the filter cartridge DisassemblySSV 05/2R Assembly Adjusting the level probeSSV 05/2R Trouble-shooting Problem Remedy Test stepsTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation