Sterling SSV 05/2R operating instructions

Page 11

SM4-610

SSV 05/2R

∙Do not carry through modifications, attachments or alterations of the unit without the manufacturer’s permission. Danger of accidents!

∙By means of this operating manual, prepare precise instructions for use of this unit. Faulty operation may lead to accidents!

∙Designate a unit leader responsible for the unit.

∙In any case, the operators of this unit must be thoroughly instructed. Faulty operation may lead to accidents!

∙If the unit has been switched off for reasons of safety, it must be protected from unathorised activation. Danger of accidents!

∙Before beginning maintenance work, designate a supervisor.

∙Before beginning maintenance work, inform the responsible operating personnel. Danger of accidents!

∙Before beginning maintenance work, interrupt the mains supply so that the unit is not switched on unintentionally. Danger of accidents!

∙Repair work may only be carried through by trained personnel. Danger of accidents!

∙The unit may never be operated when it is partially disassembled. Limbs may be drawn in! Electrical shock!

∙In case of functional disturbances, switch off the unit immediately. Errors must be eliminated immediately. Danger of accidents!

∙The unit is exclusively intended for conveying plastic granules and regrind. Any other usage is not permitted.

∙This unit is not suitable for processing foods.

Safety instructions 10

Image 11
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSV 05/2REdition 08/99 Technical serviceSSV 05/2R Sterling Material Processing SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description SSV 05/2R Method of functioning Control and maintenance unitSet-up SSV 05/2R Preparations Setting the mixing ratio of the componentsFilling level too high Filling level too lowSet-up Maintenance SSV 05/2R Maintenance intervals Disassembly SSV 05/2R Cleaning/replacing the filter cartridgeAdjusting the level probe SSV 05/2R AssemblyTest steps SSV 05/2R Trouble-shooting Problem RemedyTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation