4.3.1. Fine adjustment of the filling level in the conveyor hopper

&

Before the fine adjustment, carry through a basic adjust- ment.

During operation, carefully turn the adjustment screw (A) of the level probe by means of a screwdriver until the desired fill-

ing level is reached.

 

 

A

 

&

Clockwise rotation makes

 

 

 

 

 

the filling level fall.

 

 

Counterclockwise rotation makes the filling level rise.

 

 

 

 

 

If the filling level in the conveyor hopper cannot be lowered far enough by means of the level probe, the pressure on the control and maintenance unit can be re- duced step by step.

SM4-610

Set-up 24

Image 25
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSV 05/2RSSV 05/2R Sterling Material Processing Technical serviceEdition 08/99 SSV 05/2R Parts and Service Department Table of contents SSV 05/2R Technical data Safety instructions Safety instructionsSSV 05/2R SSV 05/2R Explanations and information SSV 05/2R For your safety SSV 05/2R SSV 05/2R SSV 05/2R For the safety of the units Installation instructions SSV 05/2R General information SSV 05/2R Installing the conveyor hopper SSV 05/2R Installing the control and maintenance unit SSV 05/2R Connecting the compressed-air supply SSV 05/2R Electrical connection Functional description SSV 05/2R Method of functioning Control and maintenance unitSet-up SSV 05/2R Preparations Setting the mixing ratio of the componentsFilling level too high Filling level too lowSet-up Maintenance SSV 05/2R Maintenance intervals Disassembly SSV 05/2R Cleaning/replacing the filter cartridgeAdjusting the level probe SSV 05/2R AssemblyTest steps SSV 05/2R Trouble-shooting Problem RemedyTechnical data SSV 05/2R Dimension sheet SSV 05/2R Spare parts list SSV 05/2R Pos ID-No Designation