8. Hold the left handrail assembly (C) near the left | 8 |
|
|
Upright (77). Insert the pulse wire from the left |
|
| |
|
|
| |
handrail assembly into the hole in the top of the |
|
|
|
Upright and out of the end of the Upright. |
|
|
|
Set the left handrail assembly (C) onto the left |
|
| C |
Upright (77). Make sure that no wires are |
|
| |
pinched. Attach the left handrail assembly with |
|
|
|
two 3/8" x 5 1/2" Screws (5) and two 3/8" Star |
|
|
|
Washers (8). Note: Start the lower Screw first. |
|
|
|
Insert the pulse wire through the three ties (only |
|
|
|
two are shown). Connect the two “L” pulse wires |
|
| Pulse |
(see also step 7). | Ties |
| |
|
| Wire | |
|
| L | Tie |
|
|
| |
| R |
| 77 |
|
|
| |
|
|
| 8 |
|
|
| 5 |
|
|
| Start First |
9. Attach the Console Base Back (89) to the | 9 |
|
|
|
Console Base (87) with nine #8 x 3/4" Machine |
|
|
| |
|
|
|
| |
Screws (16) and two #8 x 3/4" Screws (1) in |
|
|
|
|
the locations shown. Start all eleven Screws, |
|
|
|
|
and then tighten them. Do not overtighten | 87 |
|
|
|
the Screws. Make sure that no wires are |
|
|
| |
pinched. |
|
|
|
|
|
| 16 | 16 | 16 |
|
|
| ||
|
|
|
| |
|
| 16 |
| 16 |
| 1 | 89 |
| |
|
|
|
| |
|
|
|
| 1 |
| 11 |
|
|
|