ASSEMBLY STEP 3
HARDWARE BAG 3 CONTENTS : |
| A | Disengage the deck lock latch with your | |
|
|
|
| foot to lower the running deck. |
BOLT (D) | SPRING WASHER (B) | FLAT WASHER (C) |
|
|
45 mm | 15 mm | 15 mm | B | Open hardware bag 3. |
Qty: 4 | Qty: 4 | Qty: 4 | ||
GS950T, T101 Console |
| CT7.1, | C | Gently place the console on top of the |
|
| console masts. Attach the left side first | ||
|
| T102, T103 |
| |
|
| Console |
| using 2 bolts (d), 2 spring washers (b) |
|
|
|
| and 2 flat washers (c). |
|
|
| D | Connect the console cables, carefully |
|
|
|
| tucking wires in masts to avoid damage. |
|
|
| E | Attach the right side of the console |
|
|
|
| using 2 bolts (d), 2 spring washers |
| CONSOLE CABLES |
| (b) and 2 flat washers (c). | |
|
|
|
| Note: Be careful not to pinch any wires |
|
|
|
| while assembling the masts. |
ASSEMBLE | CONSOLE |
|
|
|
|
|
|
| |
LEFT SIDE | FLAT WASHERS (C) |
|
| |
FIRST | SPRING WASHERS (B) |
|
| |
|
|
| ||
| BOLTS (D) |
|
| |
| CONSOLE MAST |
| YOU ARE FINISHED! | |
|
|
|
ALL
MODELS
9