ASSEMBLY STEP 2
HARDWARE BAG 2 CONTENTS :
BOLT (B) | SPRING WASHER (C) | FLAT WASHER (D) |
20 mm | 15 mm | 15 mm |
Qty: 4 | Qty: 4 | Qty: 4 |
RUNNING DECK |
LEFT |
CONSOLE |
MAST |
FOOT LATCH |
BASE FRAME |
FLAT WASHERS (D) |
SPRING WASHERS (C) |
BOLTS (B) |
AOpen hardware bag 2.
BWith the running deck in the raised position, attach the left console mast to the base frame using 4 bolts (B), 4 spring washers (C) and 4 flat washers (D).
7