INTRODUCTION
A S S E M B LY STEP 3
IMPORTANT PRECAUTIONS
WHITE HARDWARE BAG CONTENTS :
SCREW (G) | BOLT (H) |
15 mm | 30 mm |
Qty: 4 | Qty: 2 |
SPRING WASHER (I) | WASHER (J) |
8 mm DIAMETER | 8 mm DIAMETER |
Qty: 2 | Qty: 2 |
AOpen WHITE HARDWARE BAG.
BSlide HAND RAIL SLEEVE over the top of the hand rail.
CAttach top of HAND RAIL to the console extension using 2 SCREWS (G).
ASSEMBLY
BEFORE YOU BEGIN
TREADMILL OPERATION
CONDITIONING TROUBLESHOOTING GUIDELINES & MAINTENANCE
SCREW (G) |
HAND RAIL SLEEVE |
HAND RAIL |
SPRING WASHER (I) |
BOLT (H) |
WASHER (J) |
DAttach bottom of HAND RAIL to the base frame using 1 BOLT
(H), 1 SPRING WASHER (I) and 1 WASHER (J).
ESlide HAND RAIL SLEEVE firmly against console.
FRepeat on other side.
LIMITED WARRANTY
10