| 6 |
|
|
|
| 77 |
|
|
| 24 |
|
|
| 76 | 90 1/2 X |
|
| 20 | 14 |
|
| 76 |
|
19 | 51 | 93 | 95 LOW HEIGHT NUT |
|
| ||
|
|
| |
|
| 95 LOW HEIGHT NUT |
|
|
|
| FIGURE 30 |
STEP 30
•Assemble one 3/4” SLEEVE BEARING (77), one PEC CAM (24), two 3/4” FLANGE BEARINGS (76), one 1/2” WASHER (93), and one 1/2” LOW HEIGHT LOCK NUT (95), and a LEFT (19) or RIGHT PEC ARM (20) to each threaded shaft on the BEARING HOUSING
(6). See FIGURE 30.
•Securely assemble two 3/8” SPRING PIN ASSEMBLIES (51) to the spring pin barrels of the PEC ARMS (19 & 20). See FIGURE 30.
•SECURELYassemble one TOMALOCK HANDLE (14) to each PECARM (19 & 20) using one 1/2 X
26