ParaBody 425104 manual 90 1/2 X 3-1/2

Page 26

 

6

 

 

 

 

77

 

 

 

24

 

 

 

76

90 1/2 X 3-1/2”

 

 

20

14

 

 

76

 

19

51

93

95 LOW HEIGHT NUT

 

 

 

 

 

 

 

95 LOW HEIGHT NUT

 

 

 

 

FIGURE 30

STEP 30

Assemble one 3/4” SLEEVE BEARING (77), one PEC CAM (24), two 3/4” FLANGE BEARINGS (76), one 1/2” WASHER (93), and one 1/2” LOW HEIGHT LOCK NUT (95), and a LEFT (19) or RIGHT PEC ARM (20) to each threaded shaft on the BEARING HOUSING

(6). See FIGURE 30.

Securely assemble two 3/8” SPRING PIN ASSEMBLIES (51) to the spring pin barrels of the PEC ARMS (19 & 20). See FIGURE 30.

SECURELYassemble one TOMALOCK HANDLE (14) to each PECARM (19 & 20) using one 1/2 X 3-1/2” BOLT (90) and one 1/2” LOW HEIGHT LOCK NUT (95) for each PEC ARM. See FIGURE 30.

26

Image 26
Contents Home GYM Important Notes Parts List Step 87 1/2 X Hexnut Step 84 3/8 X Step 88 1/2 X X 3 108108 3/8 HEX NUT Step 83 3/8 X 1-1/4 Step Step Step Step LOW Height NUT PUSH/PULL Underside Justment Tube 22 to rotate freely LOW Height NUT Detail Button Cable has been routed 90 1/2 X 3-1/2 Post Detail Support Tube to rotate freely Hexnut Page 102 Cable Installation 100 Cable LAT PEC Cable See Detail 83 3/8 Legext Cable LAT Cable Press Step Legext Press Cable LEG Cable 105 96 3/8 X 1 Button Head CAP Screw Step