FIGURE 36 | NOTE: REMOVE BOLTS FOR |
|
|
| |
| CABLE INSTALLATION |
|
| 17 |
|
| 25 |
|
| 66 | 102 |
| WEIGHT | |
|
| |
|
| STACK |
| 99 | CABLE |
|
| |
|
| 7 |
| 99 |
|
STEP 36
•To assemble the LAT CABLE (99) follow the cable routing as shown and use the following steps:
•Remove the two bolts in the FRONT UPRIGHT (25) and TOP BOOM (17) connection.
•Route the LAT CABLE (99) as shown in FIGURE 33. (Remove pulleys for ease of installation.)
•Run the LAT CABLE (99) through one of the holes in the
•Replace and SECURELY tighen the FRONT UPRIGHT (25) and TOP BOOM (17) connection and any pulleys from the previous step. (NOTE: Make sure the LAT CABLE runs over the top of the bolts in the top boom.)
33