ParaBody 425104 manual Cable Installation

Page 33

FIGURE 36

NOTE: REMOVE BOLTS FOR

 

 

 

 

CABLE INSTALLATION

 

 

17

 

 

25

 

 

66

102

 

WEIGHT

 

 

 

 

STACK

 

99

CABLE

 

 

 

 

7

 

99

 

STEP 36

To assemble the LAT CABLE (99) follow the cable routing as shown and use the following steps:

Remove the two bolts in the FRONT UPRIGHT (25) and TOP BOOM (17) connection.

Route the LAT CABLE (99) as shown in FIGURE 33. (Remove pulleys for ease of installation.)

Run the LAT CABLE (99) through one of the holes in the D-RING (7) and attach one KEYHOLE CLEVIS (66) to the end of the LAT CABLE (99). See FIGURE 36 .

Replace and SECURELY tighen the FRONT UPRIGHT (25) and TOP BOOM (17) connection and any pulleys from the previous step. (NOTE: Make sure the LAT CABLE runs over the top of the bolts in the top boom.)

33

Image 33
Contents Home GYM Important Notes Parts List Step 87 1/2 X Hexnut Step 84 3/8 X Step 88 1/2 X X 3 108108 3/8 HEX NUT Step 83 3/8 X 1-1/4 Step Step Step Step LOW Height NUT PUSH/PULL Underside Justment Tube 22 to rotate freely LOW Height NUT Detail Button Cable has been routed 90 1/2 X 3-1/2 Post Detail Support Tube to rotate freely Hexnut Page 102 Cable Installation 100 Cable LAT PEC Cable See Detail 83 3/8 Legext Cable LAT Cable Press Step Legext Press Cable LEG Cable 105 96 3/8 X 1 Button Head CAP Screw Step