FLOATING |
|
PULLEY |
|
| 83 3/8 X |
| |
| 101 |
15 | 91 |
| 92 |
1 |
|
101 |
|
FIGURE 44 |
|
STEP 44
•To assemble the LEG CABLE (101) follow the cable routing as shown and use the following steps:
•SECURELY attach the LEG CABLE (101) to the LEG CURL/EXT (15) using one 3/8 X
•Route the LEG CABLE (101) around the pulleys in the BASE (1) and through the floating pulley as shown in FIGURE 44.
|
|
| FIGURE 45 | STEP 45 |
| |
|
|
|
|
|
| |
|
|
|
|
| • Run the LEG CABLE (101) through the | |
|
|
|
|
| hole of the | |
|
|
|
|
| KEYHOLE CLEVIS (66) to the end of | |
|
|
|
|
| the LEG CABLE (101). See FIGURE 45. | |
101 |
|
|
|
|
|
|
|
|
|
| 66 |
|
|
|
|
|
| 101 |
|
|
|
| LAT CABLE |
|
|
|
|
|
| PRESS CABLE |
| 7 |
|
|
1/2 | 1/2 | 1/2 | 3 | 1/2 | 1/2 | 1/2 |
0 | 1 | 2 | 4 | 5 | 6 | |
|
|
| 38 |
|
|
|