ParaBody 425104 manual PEC Cable

Page 36

 

42

 

92

 

98

 

91

 

84 3/8 X 2”

FIGURE 40

29

STEP 40

Assemble one 3-1/2” PULLEY (42) around the PEC DEC CABLE (98) and to the PULLEY BRACKET (29) using one 3/8 X 2” BOLT (84), two 3/8” WASHERS (91) and one 3/8” LOCKNUT (92) as shown in FIGURE 40.

26

 

98

24

98

PEC

 

CABLE

 

 

FIGURE 41

STEP 41

 

Slide the ends of the PEC DEC CABLE (98) into the bushings on the PEC CAMS (24) as shown on FIGURE 41.

Lay the PEC DEC CABLE (98) over the pulleys and under the cable retaining clips in the CENTER PULLEY BRACKET (26) as shown in FIGURE 41. (NOTE: Securely tighten the pulley connections in the CENTER PULLEY BRACKET (26). The cable retaining clips should be at approximately a 45° angle.)

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

36

Image 36
Contents Home GYM Important Notes Parts List Step 87 1/2 X Hexnut Step 84 3/8 X Step 88 1/2 X X 3 108108 3/8 HEX NUT Step 83 3/8 X 1-1/4 Step Step Step Step LOW Height NUT PUSH/PULL Underside Justment Tube 22 to rotate freely LOW Height NUT Detail Button Cable has been routed 90 1/2 X 3-1/2 Post Detail Support Tube to rotate freely Hexnut Page 102 Cable Installation 100 Cable LAT PEC Cable See Detail 83 3/8 Legext Cable LAT Cable Press Step Legext Press Cable LEG Cable 105 96 3/8 X 1 Button Head CAP Screw Step