STEP 46
•Attach three ELASTIC CORDS (67) to the three KEYHOLE CLEVIS (66) as shown in FIGURE 46.
67 |
FIGURE 46 |
| 69 |
| TOP BOOM |
| 67 |
LEGEXT |
|
CABLE |
|
LAT CABLE | PRESS |
CABLE | |
FIGURE 47 |
|
STEP 47
• Assemble the 72” ELASTIC CORD (67) from the PRESS CABLE around the 2” PULLEY (69) in the TOP BOOM as shown in FIGURE 47.
39