ParaBody 425104 manual Cable LAT

Page 35

 

 

FIGURE 39

100

WEIGHT

 

 

STACK

 

 

CABLE

 

 

66

 

 

LAT

 

 

CABLE

7

 

 

 

100

 

 

PRESS

 

 

CABLE

 

STEP 39

Run the PRESS CABLE (100) through the hole in the D-RING (7) as shown in FIGURE 37 and attach one KEYHOLE CLEVIS (66) to the end of the PRESS CABLE (100). See FIGURE 39.

35

Image 35
Contents Home GYM Important Notes Parts List Step 87 1/2 X Hexnut Step 84 3/8 X Step 88 1/2 X X 3 108108 3/8 HEX NUT Step 83 3/8 X 1-1/4 Step Step Step Step LOW Height NUT PUSH/PULL Underside Justment Tube 22 to rotate freely LOW Height NUT Detail Button Cable has been routed 90 1/2 X 3-1/2 Post Detail Support Tube to rotate freely Hexnut Page 102 Cable Installation 100 Cable LAT PEC Cable See Detail 83 3/8 Legext Cable LAT Cable Press Step Legext Press Cable LEG Cable 105 96 3/8 X 1 Button Head CAP Screw Step