Installation Instructions
Electrical connection
All electrical work must be performed by a qualified service technician in accordance with applicable codes and standards.
The connecting terminal is located behind a cover.
The machine must only be connected to the voltage and frequency shown on the data plate.
The machine is equipped with a
Steam heated washers are factory set to 3 phase, 208 V, 60 Hz
They can be converted to
3 phase, 240 V, 60 Hz by a Miele Service Technician.
Electrically heated washers are factory set to 3 phase, 230 V, 50/60 Hz
They can be converted to
3 phase, 208 V, 60 Hz by a Miele Service Technician.
To activate the heating the water level in the drum must be 2" (50 mm) high.
A motor overload protection is located in the motor winding.
See the enclosed wiring and installation diagrams.
Steam connection
The steam connection must only be connected by a certified installer. For more information see the enclosed installation plan and the installation manual.
Connecting the dispensing pumps
The connecting terminal for 4 time controlled dispensing pumps is located behind the cover next to the electrical connection.
The dispensing pumps can be operated without the multifunction module.
42