C. DRYER ENCLOSURE REQUIREMENTS

Even though a 12-inch (30.48 cm) clearance is acceptable, it is recommended that the rear of the dryer be positioned approximately two (2) feet (24-inches) - 0.61 meters (60.96 cm) - from the nearest obstruction (i.e., wall) for ease of installation, maintenance, and service. Bulkheads and partitions should be made from noncombustible materials. The clearance between the bulkhead header and the dryer must be a minimum of 4- inches (10.16 cm) and must not extend more than 4-inches (10.16 cm) to the rear of the front. The bulkhead facing must not be closed in ALL the way to the top of the dryer. A 2-inch (5.08 cm) clearance is required.

NOTE: Bulkhead facing should not be installed until after the dryer is in place. Ceiling area must be located a minimum of 12-inches (30.48 cm) above the top of the dryer.

IMPORTANT: Even though a minimum of only 12-inches (30.48 cm) is required, 18-inches (45.72 cm) or more is suggested, for steam dryers and especially in cases where sprinkler heads are over the dryers.

NOTE: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm) above the dryer console (module) is suggested. Dryers may be positioned side wall to side wall, however, 1 or 2-inches (2.54 or 5.08 cm) is suggested for ease of installation and maintenance. Allowances must be made for the opening and closings of the control door and the lint door.

13

Image 17
Contents MLG-130DR HSI Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Dryer Front View Illus. No Component IdentificationDryer Rear View Illus. No Location Requirements Installation ProceduresRear of Dryer refer to the illustration on UNPACKING/SETTING UPPage Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Be Reduced Anywhere Down Stream of the Dryer Page Multiple Dryer Common Venting Page Electrical Requirements Electrical InformationMLG-130DR Gas Electrical Service SpecificationsElectrical Connections GAS Information Gas Connections Inlet connection ---------- 1-inch N.P.T Technical Data Gas SpecificationsLiquid Propane L.P. Gas Type of GasPage Preoperational Tests Preparation for OPERATION/START-UPGas Basket Coating Operating InstructionsShut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards Page Cleaning Routine MaintenanceLubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELLADJUSTMENTSProcedure for Functional Check Replacement Components Page Start the drying cycle For Phase 6 Models Manual Reset HI-LIMIT InstructionsADC113130 1- 03/28/00-25