The duct work should be smooth inside with no projections from sheet metal screws or other obstructions which will collect lint. When adding ducts, the duct to be added should overlap the duct to which it is to be connected. ALL duct work joints must be taped to prevent moisture and lint from escaping into the building. Inspection doors should be installed at strategic points in the exhaust duct work for periodic inspection and clean-out of lint from the duct work.

NOTE: Where the exhaust duct passes through a wall, ceiling, or roof made of combustible materials, the opening must be 2-inches (5.08 cm) larger (all the way around) than the duct. The duct must be centered within this duct.

a.Outside Duct Work Protection

1)To protect the outside end of horizontal duct work from the weather, a 90° elbow bent downward should be installed where the exhaust exits the building. If the exhaust duct work travels vertically up through the roof, it should be protected from the weather by using a 180° turn to point the opening downward. In either case, allow at least twice the diameter of the duct between the duct opening and the nearest obstruction.

IMPORTANT: DO NOT use screens or caps on the outside of opening of exhaust duct work.

19

Image 23
Contents MLG-130DR HSI Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Dryer Front View Illus. No Component IdentificationDryer Rear View Illus. No Location Requirements Installation ProceduresRear of Dryer refer to the illustration on UNPACKING/SETTING UPPage Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Be Reduced Anywhere Down Stream of the Dryer Page Multiple Dryer Common Venting Page Electrical Requirements Electrical InformationMLG-130DR Gas Electrical Service SpecificationsElectrical Connections GAS Information Gas Connections Inlet connection ---------- 1-inch N.P.T Technical Data Gas SpecificationsLiquid Propane L.P. Gas Type of GasPage Preoperational Tests Preparation for OPERATION/START-UPGas Basket Coating Operating InstructionsShut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards Page Cleaning Routine MaintenanceLubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELLADJUSTMENTSProcedure for Functional Check Replacement Components Page Start the drying cycle For Phase 6 Models Manual Reset HI-LIMIT InstructionsADC113130 1- 03/28/00-25