Maytag W10096984A, W10097000A-SP, MGDX600XW Make Gas Connection, Connect Vent

Page 13

2. Connect vent to exhaust hood

Vent must fit over the exhaust hood. Secure vent to exhaust hood with 4" (102 mm) clamp. Run vent to dryer location using straightest path possible. Avoid 90° turns. Use clamps to seal all joints. Do not use duct tape, screws, or other fastening devices that extend into interior of vent to secure vent, because they can catch lint.

Make Gas Connection

1. Connect gas supply to dryer

Flared

Non-flared

male fitting

male fitting

3. Open shut-off valve

Closed valve

Open valve

Open shut-off valve in supply line; valve is open when handle is parallel to gas pipe. Then, test all connections by brushing on an approved noncorrosive leak-detection solution.

Bubbles will show a leak. Correct any leaks found.

Connect Vent

1.Connect vent to exhaust outlet

Remove red cap from gas pipe. Using a wrench to tighten, connect gas supply to dryer. Use pipe-joint compound on threads of all non-flared male fittings. If flexible metal tubing is used, be sure there are no kinks.

NOTE: For LP gas connections, you must use pipe-joint compound resistant to action of LP gas. Do not use TEFLON®† tape.

2. Plan pipe fitting connection

Using a 4" (102 mm) clamp, connect vent to exhaust outlet in dryer. If connecting to existing vent, make sure vent is clean. Dryer vent must fit over dryer exhaust outlet and inside exhaust hood. Check that vent is secured to exhaust hood with a 4" (102 mm) clamp.

2.Move dryer to final location

A

B

A. 3/8" flexible gas connector B. 3/8" dryer pipe

D

C

C. 3/8" to 3/8" pipe elbow

D. 3/8" pipe-to-flare adapter fitting

A combination of pipe fittings must be used to connect dryer to existing gas line. A recommended connection is shown. Your connection may be different, according to supply line type, size, and location.

†®TEFLON is a registered trademark of E.I. Dupont De Nemours and Company.

Move dryer to final location. Avoid crushing or kinking vent. After dryer is in place, remove corner posts and cardboard from under the dryer.

13

Image 13
Contents Gaz É.-U. et Canada et Électrique Canada uniquement Table of Contents Table des matièresYour safety and the safety of others are very important Dryer SafetyWhat to do if YOU Smell GAS Tools needed for all installations Installation RequirementsTools needed for gas installations Tools and PartsParts supplied Location RequirementsParts needed You will needWide Models Dryer Dimensions Installation clearancesInstallation Spacing Installation spacing for recessed area or closetElectrical Requirements Install Leveling LegsPrepare dryer for leveling legs It is your responsibilityGas Supply Requirements GAS Dryer Power HookupScrew in leveling legs Burner input requirements Dryer gas pipeVenting Requirements VentingOptional exhaust installations Recommended exhaust installationsAlternate installations for close clearances Plan Vent SystemVent System Chart Install Vent SystemVent System Chart Wide Long Vent Models Only Install exhaust hoodConnect Vent Make Gas ConnectionTighten and adjust leveling legs Complete Installation ChecklistLevel Dryer Reverse Door Swing OptionalRemove bottom screws Place towel on dryerLift door off top screws Remove and transfer hinge hole plugsRemove screws from door Remove screws from hingesRotate outer door Super Wide Side-Swing DoorAttach door hinges Flip door over Remove door strikeWide Model Side-Swing Door Remove door strike plug Remove bottom screwsFlip door over Remove screws from door Attach door hingesRemove and transfer plugs Troubleshooting Sécurité de la sécheuse QUE Faire Dans LE CAS D’UNE Odeur DE GAZ Outils nécessaires pour toutes les installations Exigences D’INSTALLATIONOutillage et pièces Outils nécessaires aux installations au gaz Exigences d’emplacementPièces fournies Pièces nécessairesEspacement pour une installation Espacements d’installation’est à l’utilisateur qu’incombe la responsabilité de Spécifications électriquesRaccordement D’UNE Sécheuse À GAZ Installation des pieds de nivellementSpécifications de l’alimentation en gaz Préparer la sécheuse pour les pieds de nivellementExigences concernant le raccordement au gaz Canalisation de gazCanalisation d’arrivée de gaz de la sécheuse Caractéristiques d’alimentation du brûleurÉpreuve sous pression de lalimentation en gaz Altitudes supérieures à 10 000 pieds 3 048 mClapets de décharge Exigences concernant levacuationConduit métallique rigide Brides de serrageInstallations dévacuation facultatives Installations dévacuation recommandéesInstallations alternées pour dégagements étroits Planification du système d’évacuationDispositions spéciales pour les maisons mobiles Tableau des systèmes d’évacuationDéterminer l’itinéraire d’acheminement du conduit Raccordement au gaz Installation du circuit d’évacuationRégler l’aplomb de la sécheuse Déplacer la sécheuse à son emplacement finalRaccorder le conduit d’évacuation La bouche d’évacuationInversion du sens de l’ouverture de la Porte facultatif Achever l’installation liste de VérificationPlacer une serviette sur la sécheuse Modèle large avec porte à grande ouverture latérale deSoulever la porte pour la dégager des vis supérieures Ôter les vis inférieures Contrôler l’alignement de la gâche de la portePorte à très grande ouverture latérale de Ôter les vis du panneau de porte Ôter les vis des charnières Faire pivoter la porte externeRetourner la porte Retirer la gâche de porte Modèle large avec porte à ouverture latérale de Retirer le bouchon d’obturation de la gâche de porteFixer les charnières de porte Ôter les vis des charnières Retourner la porteDépannage Page W10096984A W10097000A-SP