Maytag MGDX600XW Level Dryer, Complete Installation Checklist, Reverse Door Swing Optional

Page 14

Level Dryer

1. Level dryer

Check levelness of dryer from side to side. Repeat from front to back.

NOTE: The dryer must be level for the moisture sensing system to operate correctly.

Not Level

LEVEL

Not Level

2. Tighten and adjust leveling legs

If dryer is not level, prop up using a wood block, use wrench to adjust legs up or down, and check again for levelness. Once legs are level, make sure all four legs are snug against the ground before tightening them.

Complete Installation Checklist

qCheck that all parts are now installed. If there is an extra part, go back through steps to see what was skipped.

qCheck that you have all of your tools.

qDispose of/recycle all packaging materials.

qCheck dryer’s final location. Be sure vent is not crushed or kinked.

qCheck that dryer is level. See “Level Dryer”.

qRemove film on console and any tape remaining on dryer.

qWipe dryer drum interior thoroughly with a damp cloth to remove any dust.

qRead “Dryer Use” in your Use and Care Guide.

qSet the dryer on a full heat cycle (not an air cycle) for 20 minutes and start the dryer.

If the dryer will not start, check the following:

■■ Dryer is plugged into a grounded 3 prong outlet. ■■ Electrical supply is connected.

■■ Household fuse is intact and tight, or circuit breaker has not tripped.

■■ Dryer door is closed.

qWhen the dryer has been running for 5 minutes, open the dryer door and feel for heat. If you feel heat, cancel cycle and close the door.

If you do not feel heat, turn the dryer off and check to see whether gas supply line shutoff valve is open.

■■ If the gas supply line shutoff valve is closed, open it, then repeat the 5-minute test as outlined above.

■■ If the gas supply line shutoff valve is open, contact a qualified technician.

NOTE: You may notice an odor when the dryer is first heated. This odor is common when the heating element is first used. The odor will go away.

Reverse Door Swing (Optional)

If your door is the 29" Large Side-Swing Door, follow steps 1-6.

If your door is the 29" Super Wide Side-Swing Door, follow steps 1-13.

If your door is the 27" Wide Side-Swing Door, follow steps 1-11.

NOTE: Magnetized screw driver is helpful.

14

Image 14
Contents Table of Contents Table des matières Gaz É.-U. et Canada et Électrique Canada uniquementDryer Safety Your safety and the safety of others are very importantWhat to do if YOU Smell GAS Tools needed for gas installations Installation RequirementsTools needed for all installations Tools and PartsParts needed Location RequirementsParts supplied You will needInstallation Spacing Installation clearancesWide Models Dryer Dimensions Installation spacing for recessed area or closetPrepare dryer for leveling legs Install Leveling LegsElectrical Requirements It is your responsibilityScrew in leveling legs GAS Dryer Power HookupGas Supply Requirements Dryer gas pipe Burner input requirementsVenting Venting RequirementsAlternate installations for close clearances Recommended exhaust installationsOptional exhaust installations Plan Vent SystemVent System Chart Wide Long Vent Models Only Install Vent SystemVent System Chart Install exhaust hoodMake Gas Connection Connect VentLevel Dryer Complete Installation ChecklistTighten and adjust leveling legs Reverse Door Swing OptionalLift door off top screws Place towel on dryerRemove bottom screws Remove and transfer hinge hole plugsRotate outer door Remove screws from hingesRemove screws from door Super Wide Side-Swing DoorFlip door over Remove door strike Attach door hingesRemove door strike plug Remove bottom screws Wide Model Side-Swing DoorRemove and transfer plugs Remove screws from door Attach door hingesFlip door over Troubleshooting Sécurité de la sécheuse QUE Faire Dans LE CAS D’UNE Odeur DE GAZ Outillage et pièces Exigences D’INSTALLATIONOutils nécessaires pour toutes les installations Pièces fournies Exigences d’emplacementOutils nécessaires aux installations au gaz Pièces nécessairesEspacements d’installation Espacement pour une installationSpécifications électriques ’est à l’utilisateur qu’incombe la responsabilité deSpécifications de l’alimentation en gaz Installation des pieds de nivellementRaccordement D’UNE Sécheuse À GAZ Préparer la sécheuse pour les pieds de nivellementCanalisation d’arrivée de gaz de la sécheuse Canalisation de gazExigences concernant le raccordement au gaz Caractéristiques d’alimentation du brûleurAltitudes supérieures à 10 000 pieds 3 048 m Épreuve sous pression de lalimentation en gazConduit métallique rigide Exigences concernant levacuationClapets de décharge Brides de serrageInstallations alternées pour dégagements étroits Installations dévacuation recommandéesInstallations dévacuation facultatives Planification du système d’évacuationDéterminer l’itinéraire d’acheminement du conduit Tableau des systèmes d’évacuationDispositions spéciales pour les maisons mobiles Installation du circuit d’évacuation Raccordement au gazRaccorder le conduit d’évacuation Déplacer la sécheuse à son emplacement finalRégler l’aplomb de la sécheuse La bouche d’évacuationPlacer une serviette sur la sécheuse Achever l’installation liste de VérificationInversion du sens de l’ouverture de la Porte facultatif Modèle large avec porte à grande ouverture latérale deSoulever la porte pour la dégager des vis supérieures Porte à très grande ouverture latérale de Contrôler l’alignement de la gâche de la porteÔter les vis inférieures Retourner la porte Ôter les vis des charnières Faire pivoter la porte externeÔter les vis du panneau de porte Retirer la gâche de porte Retirer le bouchon d’obturation de la gâche de porte Modèle large avec porte à ouverture latérale deÔter les vis des charnières Retourner la porte Fixer les charnières de porteDépannage Page W10096984A W10097000A-SP