White Rodgers 36h Parts and Accessories, Mounting Positions, Inlet Boss, Upright Vertical

Page 2

SPECIFICATIONS

Parts and Accessories:

Natural to Regulated LP Gas Conversion Kits, regulation range 5” to 12” W.C.:

92-0659included with single stage models or F92-0659available separately

92-1008included with two-stage models or F92-1008available separately

Two 92-0659kits may be used for two-stage valve

Pilot fitting 0092-080800 included or F69-0727 available separately

MOUNTING POSITIONS:

Upright, or to 90° from upright

 

 

 

 

 

 

LEFT or RIGHT

 

INLET BOSS

UPRIGHT

 

VERTICAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

360˚￿

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 1. Gas Valve Mounting Positions

4.20R

 

SWING RADIUS

INLET 3/4- 14 NPT

VENT PLUG

or 1/2- 14 NPT

1/8”-27 NPT

 

 

PILOT GAS OUTLET

 

 

 

3.77

PLUG OR FITTING

 

 

 

 

 

 

 

 

 

.88

1.45

.03

1.375

 

 

 

 

1.20

 

.19

 

CENTERLINE OF

 

 

 

 

 

 

1.13

1.63

INLET & OUTLET

 

 

 

 

 

1.375

 

1.63

.32

 

3.26

 

OUTLET 3/4- 14 NPT

 

INLET PRESSURE TAP

 

 

 

 

1/8” - 27 NPT

 

 

OUTLET PRESSURE TAP

 

 

 

 

1/8” - 27 NPT

 

Note: All dimensions indicated in inches

Figure 2. Valve Dimensions and Features

2

Image 2
Contents Contents SpecificationsInstallation Instructions DescriptionUpright, or 0 to 90 from upright Left or Right Parts and AccessoriesMounting Positions Inlet BossPrecautions Donotbegininstallationuntilyoureadthefollowing PrecautionsLP GAS Conversion InstallationMain Piping connections Pilot Gas ConnectionSystem Wiring SeeTypical Wiring for Proven/Intermittent Pilot System Pilot Flame Adjustment AdjustmentPressure Regulator Adjustment Outlet Pressure AdjustmentOperating Instructions Foryour Safety Read Before OperatingLighting Instructions To Turn OFF GAS to ApplianceSpécifications Instructions D’INSTALLATIONDescription Verticale, ou de 0 à 90 de la verticale Gauche ou Droite Pièces et accessoiresPositions DE Montage Entrée BossPrécautions AvertissementBranchement DU GAZ Pour UNE Flamme Pilote Principaux raccords de tuyauxConversion AU GPL Immédiatement Toutes LES FuitesCâblage DU Système Caractéristiques et identification des bornesCâblage typique pour système d’allumage par surface chaude Réglage de la pression De sortie AjustementAjustement DU Régulateur DE Pression Ajustement de la Flamme piloteInstructions D’UTILISATION Instructions D’ALLUMAGEPour Votre SÉCURITÉ, Lire Avant L’UTILISATION Pour Couper L’ALIMENTATION DE GAZ DE L’APPAREILEspecificaciones Instrucciones DE InstalaciónDescripción ContenidoPosiciones DE Montaje EspecificacionesPiezas y accesorios Recta, o 0 a 90 de la posición recta Izquierda o DerechaPrecauciones Pérdida de vidasConversión Para GAS DE Petróleo Licuado InstalaciónConexiones de las tuberías principales Conexión para gas con pilotoConecte los cables consecuentemente ver las figs y Conexiones DEL SistemaPrincipal MP del puente externo ver las figs y Instalación ControladorAjuste de presión de salida AjusteAjuste DEL Regulador DE Presión Ajuste de la llama del pilotoInstrucciones DE USO Instrucciones DE EncendidoPOR SU Seguridad LEA Antes DE Usar Para Cerrar EL GAS QUE Llega AL Artefacto