APPENDIX — SLUMPTEST PROCEDURE
1.To obtain a representative sample (concrete), take several samples at three or more regular intervals throughout the discharge of the mixer or truck.DONOTtake samples at the beginning or end of the discharge.
2.Dampentheinsideoftheconeandplaceitonasmooth,moist, nonabsorbent, level surface large enough to accommodate boththeslumpedconcreteandtheslumpcone.Standonthe “foot pieces” throughout the test procedure to hold the cone firmly in place.
3.Fillthecone1/3fullbyvolume
4.Fillconeanother1/3
5.
6.
7.
8.Lay a straight edge (Figure
BULLET POINTED
STEEL ROD
Figure 34-B. Slump
Test (2/3 Full)
2/3 FULL
Figure 34-C. SlumpTest
(Full-Overflow)
FULL (OVERFLOW)
Figure 34-D. SlumpTest
(Removing Excess Concrete)
Figure 34-E. SlumpTest
(Cone Invert)
| 1/3 FULL | |
1/2 DIAMETER | FOOT | |
24 INCHES LONG | ||
PIECE | ||
|
Figure 34-A. SlumpTest (1/3 Full)
Figure 34-F. SlumpTest
(Measurement)