Programming the Meter
Meter Installation
CAUTION
Failure to comply with the following installation requirements may result in warranty coverage being denied.
•Fluid lines MUST be thoroughly flushed before installing Matrix meters. See CleanLine Filtration System, Instruction Manual 310652.
•All Matrix systems MUST use the Graco Clean- Line System for initial flushing and ongoing oper- ation for all service fluids. See CleanLine Filtration System, Instruction Manual 310652.
•Pressure relief kits MUST be used on all pumps within the Matrix system to prevent
KEY | DESCRIPTION, See FIG. 3. |
|
|
D | Thermal Pressure Relief Kit must be |
| installed downstream from the pump. The |
| Thermal Pressure Relief Kit will vary based |
| on the pump selected |
|
|
E | Fluid |
|
|
F | Air Regulator |
|
|
G | CleanLine Filter System |
|
|
H | Pump * † |
|
|
J | Filter and Lubricator Assembly |
|
|
K | Master Bleed Air Valve (ball valve) |
|
|
* Do not use diaphragm pumps in a Matrix system.
†Special pump packages are required for anti- freeze. See instruction manual 310650.
K
J
F
H E
G
D
ti5127
FIG. 3
6 | 309497L |