Multiquip HHXG5 operation manual Training checklist, Completely

Page 6

training checklist

TRAINING CHECKLIST

This checklist will lists some of the minimum requirements for machine maintenance and operation. Please feel free to detach it and make copies. Use this checklist whenever a new operator is to be trained or it can be used as a review for more experienced operators.

Training Checklist

No,

Description

OK?

Date

1Read operation manual

completely.

 

Machine layout, location of

2

components, checking of engine

 

and hydraulic oil levels.

 

 

3

Fuel system, refueling procedure.

 

 

4

Operation of spray and lights.

 

 

5

Operation of controls (machine

not running).

 

 

 

6

Safety controls, safety stop switch

operation.

 

7

Emergency stop procedures.

 

 

8

Startup of machine, pre-heat,

engine choke.

 

 

 

9

Maintaining a hover.

 

 

10

Maneuvering.

 

 

11

Pitching.

12Matching blade pitch. Twin-Pitch™

13Concrete fi nishing techniques.

14Shutdown of machine.

15Lifting of machine (lift loops).

16Machine transport and storage.

page 6 — HHXg5 RIDE-ON TROWEL • operation manual — rev. #1 (10/25/10)

Image 6
Contents Model HHXG5 Proposition 65 Warning Silicosis/Respiratory Warnings Silicosis WarningRespiratory Hazards Table of Contents HHXG5 Ride-On TrowelPage Training checklist CompletelyDaily pre-operation checklist Daily pre-Operation ChecklistSafety Information SaFeTY meSSageSGeNeRaL SaFeTY Order Form PT-160 TROWeL SaFeTYENgINe SaFeTY Before servicing equipmentFueL SaFeTY BaTTeRY SaFeTY„ Use well-insulated gloves when picking up the battery Lifting TRaNSpORTINg SaFeTYTOWINg SaFeTY „ aLWaYS shutdown engine before transportingENvIRONmeNTaL SaFeTY DIMENSIONS/SPECIFICATIONS Trowel HHX SpecificationsSpecifications Engine FuelGeneral Information Controls and Indicators HHXG5 Controls and Indicators FrontHHXG5 Controls and Indicators Rear HHXG5 Controls and Indicators Clamshell Open Engine Components Gasoline Linked to the accelerator systemSetup Trowel Setup InstructionsBattery Setup Gearbox Oil Level InspectionEngine Oil Level FuelOperation Starting the EngineSteering Control Joystick Directional PositioningBlade Pitch Matching Blade Pitch for Both Sets of BladesWeekly 30-40 Hours MAINTENANCEMaintenance Schedule Daily 8-10 Hours Monthly 100-150 HoursOil Filter 300 Hours Air Cleaner DailyChanging Engine Oil And Filter Fuel FilterOil And Fuel Lines Battery/Charging SystemOil/Water Separator Radiator/Cooling SystemMAINTENANCE old style clutch Checking The Drive BeltRemoving the Drive Belt Installing the Drive Belt Using New Drive Belt Expanding Lower Drive PulleySpare Drive Belt Replacement Left Side GearboxHow It Works Figure Springs High Engine RPM Driven PulleyClutch Spring Driven Pulley CAM Bracket Moveable Fixed FaceMAINTENANCE new style clutch Belt measurementInstalling Drive Belt Lower drive pulleyHow it works Single Pitch MAINTENANCE TrowelBlade Pitch Adjustment Procedure Twin PitchTMChanging Blades Steering AdjustmentClean-Up „„Do the pitch control towers rock back and forth?Place the trowel in a FLAT, Level area Trowel Arm AdjustmentAssembly Distance from the lower wear plateTrowel Blade Removal Trowel Arm RemovalRemove the trowel arm from the spider plate Locate the trowel arm adjustment tool P/N Checking Trowel Arm StraightnessRe-Assembly Installing Pans Onto Finisher BladesLifting/Crush Hazard.DO not lift trowel with pans attached Verify the hydraulic fluid level is correct Checking Steering PressureHydraulic Steering Pressure Move the throttle lever to Full engine RPMSteering Pressure Adjustment Steering Pressure CheckDecommissioning trowel Decommissioning Trowel/ComponentsWiring Diagram Engine StarterConnector Orientation Front View Relay Orientation Troubleshooting Symptom Possible problem SolutionTroubleshooting Ride-On Trowel Troubleshooting engine Air cleaner dirty? Clean or replace air cleaner HERE’S HOW to GET Help
Related manuals
Manual 68 pages 56.17 Kb