Section 3

 

Pre Installation Information

 

 

 

 

Technical Requirements

Video Sync Source

The Centuri Processor requires a feed of video sync. Other sources – MIDI or wordclock etc. – cannot be used as the sync reference.

The sync required is 75Ω 1V(pk-pk) black-and-burst video. The standard can be either PAL (625 line, 50Hz) , NTSC (525 line, 59.94Hz or 60Hz). Composite sync may also be used.

Many other studio peripherals (digital recorders, editors and all video picture recorders) will also require a feed of video sync. Depending on the studio configuration, a suitable video distribution amplifier may also be required.

Note : The Centuri processor does not provide internal sync generation.

Power Connections – Mains Input Voltage & Current

Both the console control surface and the Centuri processor rack are fitted with auto-sensing power supplies and will function at any voltage from 90 to 250 volts without adjustment.

The console is supplied with one or more detachable mains leads. These leads are 2m in length and the cable diameter is 11mm. The free ends of these leads are unterminated for connection to a suitable outlet.

The inrush current present when powering the console can be significant – typically ten times the steady current

– so the use of ‘slow’ or ‘motor’ rated fuses/circuit-breakers is recommended.

NetBridge (which is a separate 2U unit – see page 23) is fitted with a voltage select switch for 230V or 115V operation. Confirm that the voltage is correctly set before applying power – see page 23.

See Appendix A for equipment specifications.

Grounding

A standard system should not require any additional grounding over and above that supplied by a correctly installed mains supply. All rack unit chassis are permanently bonded to mains earth. A permanent mains earth connection via the mains inlet must be provided.

If, due to the quality of the mains wiring within an installation, it is deemed necessary to improve upon the mains earthing, chassis ground connection points are provided as follows:

Centuri rack chassis ground can be accessed via a stud located on the rear panel.

Console chassis ground can be accessed via a stud located on the mains power connector panel.

All audio connectors, both analogue and digital, have their screen pins connected directly to the chassis at the point of entry to comply with AES/EBU grounding and EMC standards.

Page 11

Image 15
Contents Installation Guide Page Solid State Logic Solid State Logic Contents Introduction Voltage Selection and Fusing Safety ConsiderationsElectrical Safety Warning Installation InstructionsMains Isolation and Over-Current Protection Safety Earth ConnectionMains Supply and Phases Physical SafetyFCC Certification CE CertificationCommissioning Pre Installation InformationServices provided by SSL WarrantyAcoustic Isolation Physical RequirementsConsole Control Surface Rack Mounting Equipment Centuri, NetBridge and StageboxesChannel Footprint Side Profile Showing Service AccessService Access Air Conditioning RequirementsCable Ducting SB Crate side view Showing Card Access Centuri Processor Crate side view Showing Card AccessGrounding Power Connections Mains Input Voltage & CurrentTechnical Requirements Video Sync SourceEVS C100 Channel Bay LayoutC100 Console System ComponentsCenturi Processor Crate Rear View Centuri Processor Crate Front ViewCenturi Processor Console Routing/Link Card Interface System DiskCenturi Console Interface Card Centuri DSP CardCenturi Disk Card Centuri CPU Card+5V Mic Input Analogue I/O Digital I/OCenturi Madi Card Copper version Centuri Micamp CardCenturi Analogue I/O Card Centuri Digital I/O CardMorse Router Morse 3U Stagebox SB Stagebox Front ViewMorse System option SB Stagebox optionNetBridge Front View NetBridge Rear ViewNetBridge PSU Voltage Selection NetBridge option Location Of Bellypanel USB Connectors TFT External Input option External Keyboard / Trackball optionsScript Tray option Loudspeaker Shelf optionConsole Mains Inlet Panel Centuri Mains Inlet PanelNetBridge Rear Panel Power Supply Connections Installation WiringControl Surface Wiring Block Diagram Audio Console Connector PanelCPU Card Control Card Centuri to Console Surface Connections CPU Card PSU Status Wiring DiagramSync Source PSU StatusAnalogue I/O Card Micamp Input CardAnalogue input/output Card SSL ref MicAmp Card SSL refMadi I/O Card Copper version Digital I/O Card D25 versionDigital Input/Output Card 75Ω SSL ref XJ Digital Input/Output Card 110Ω SSL ref XFGPI I/O Card GPI I/O SSL ref XA GPI Output circuitGPI Input circuit SB CPU Card Fibre Link Connectors and PanelsSB Cabling Diagrams Centuri Link CardStageboxes & Fibre Links TCP/IP NetBridge InstallationConnection NetBridge InstallationAccess Remote DiagnosticsTalkback system Block Diagram C100 ConsoleCenturi Chassis Talkback and Oscillator Talkback ConnectionsOscillator Connections Meter and Phasescope wiring MSD 600C Meter and Phasescope wiring RTWCenturi Crate Meters and Phasescope Gold is 1.9 times heavier than Lead Appendix a Specifications Centuri Processor Crate Net Bridge SB Micamp Rack Hood Free Socket Appendix B Connector DetailsDL 96-Pin Hood Varicon 56-pin PlugSocket25-way XLR 3-PinDIN 5-Pin Type MultipinMeter Inputs Analogue Appendix C Connector Pinouts C100 ConsoleMSD Diag Diagnostics / Remote Control Phase Scope DigitalExpansion Connector Pinouts Centuri ProcessorMachine Control TimecodeSerial Ttya TTYD, Ttyf Ttyh RS422Ttye RS232 Mic in 1 Mic Input Card ‘908Analogue in / Analogue OUT Analogue I/O Card ‘904BNC Breakout Panel Digital I/O Card ‘902AES/EBU In 1-8 9-16, 17-24 AES/EBU Out 1-8 9-16, 17-24GPI Outputs 1 12 13 24, 25 36, 37 48, 49 GPI I/O Card ‘907Terminal Connector Pinouts NetBridgeNetBridge Diagnostic Cable Serial 1-8 RS232C100 Installation Guide Connecting to Unbalanced Equipment Appendix D Audio InterfacingBalanced Circuits C100 Installation Guide Appendix E Environmental Specification +4dBu = 1.229V rms dBu = 0.775V rms. -6dBu = 0.388V rms Design Requirements for a Flightcase Appendix F Additional Information for Installing StageboxesThis page is blank intentionally Cables and Accessories by Part Description Appendix G Cables and accessoriesMiscellaneous/Hardware Description SSL Part No Video & SyncAppendix G Part Numbers More Notes