Solid State Logic 82S6PC1010C manual Installation Wiring, Power Supply Connections

Page 31

Section 5

 

Installation Wiring

 

 

 

 

Section 5 – Installation Wiring

This section provides the details for connecting the system components together.

Power Supply Connections

This section refers to the following supplied cables (:

Description

SSL Part No.

qty

Con IEC Free Socket 6A 2m

32VGL362

2

Cable Power Digital 2m

32VALXVX

2

Lead Chassis Earth 16m

66C93115

1

Notes

Centuri

Main & Redundant Console power Console to Centuri

a) Connect both the con sole’s Harting mains leads to in dependent mains supplies. For live tr ansmissions work it is r ecommended that on e of t he power sourc es will be from an un-int erruptable so urce. The console is fitted with auto-ranging power supplies which will accept mains voltages which range from 90 to 255V without adjustment.

THE TWO POWER SOURCES MUST NOT BE FROM DIFFERENT PHASES OF A 3-PHASE SUPPLY. THE MAINS SAFETY EARTH MUST BE CONNECTED

b)Connect both the Centuri’s IEC leads to independent mains supplies. The Centuri crate is also fitted with auto-ranging power su pplies wh ich will acc ept mains voltages whic h ran ge fro m 90 t o 255V without adjustment.

c)If specified, do not connect a source of power to the NetBridge until the voltage select switch position has been confirmed. The NetBridge operates at either 115V or 230V ranges and its power supply must be set to the appropriate range for the local supply.

Refer to the diagram on page 22 for the location of the voltage select switch.

d)Earth Wiring – A chassis to chassis earth cable needs to be installed between the console and the processor. This keeps the two earths at the same potential thus preventing currents flowing along the signal cables. Run the green chassis earth cable from the Con sole’s earth bolt to the similar earth bolt lo cated on the Centuri chassis.

Page 27

Image 31
Contents Installation Guide Page Solid State Logic Solid State Logic Contents Introduction Voltage Selection and Fusing Safety ConsiderationsElectrical Safety Warning Installation InstructionsMains Isolation and Over-Current Protection Safety Earth ConnectionMains Supply and Phases Physical SafetyFCC Certification CE CertificationCommissioning Pre Installation InformationServices provided by SSL WarrantyAcoustic Isolation Physical RequirementsConsole Control Surface Rack Mounting Equipment Centuri, NetBridge and StageboxesChannel Footprint Side Profile Showing Service AccessAir Conditioning Requirements Service AccessCable Ducting SB Crate side view Showing Card Access Centuri Processor Crate side view Showing Card AccessGrounding Power Connections Mains Input Voltage & CurrentTechnical Requirements Video Sync SourceEVS C100 Channel Bay LayoutC100 Console System ComponentsCenturi Processor Crate Rear View Centuri Processor Crate Front ViewCenturi Processor Console Routing/Link Card Interface System DiskCenturi Console Interface Card Centuri DSP CardCenturi Disk Card Centuri CPU Card+5V Mic Input Analogue I/O Digital I/OCenturi Madi Card Copper version Centuri Micamp CardCenturi Analogue I/O Card Centuri Digital I/O CardMorse Router Morse 3U Stagebox SB Stagebox Front ViewMorse System option SB Stagebox optionNetBridge Rear View NetBridge Front ViewNetBridge PSU Voltage Selection NetBridge option Location Of Bellypanel USB Connectors TFT External Input option External Keyboard / Trackball optionsScript Tray option Loudspeaker Shelf optionCenturi Mains Inlet Panel Console Mains Inlet PanelNetBridge Rear Panel Power Supply Connections Installation WiringAudio Console Connector Panel Control Surface Wiring Block DiagramCPU Card Control Card Centuri to Console Surface Connections CPU Card PSU Status Wiring DiagramSync Source PSU StatusAnalogue I/O Card Micamp Input CardAnalogue input/output Card SSL ref MicAmp Card SSL refMadi I/O Card Copper version Digital I/O Card D25 versionDigital Input/Output Card 75Ω SSL ref XJ Digital Input/Output Card 110Ω SSL ref XFGPI I/O Card GPI Output circuit GPI I/O SSL ref XAGPI Input circuit SB CPU Card Fibre Link Connectors and PanelsSB Cabling Diagrams Centuri Link CardStageboxes & Fibre Links TCP/IP NetBridge InstallationConnection NetBridge InstallationAccess Remote DiagnosticsC100 Console Talkback system Block DiagramCenturi Chassis Talkback Connections Talkback and OscillatorOscillator Connections Meter and Phasescope wiring RTW Meter and Phasescope wiring MSD 600CCenturi Crate Meters and Phasescope Gold is 1.9 times heavier than Lead Appendix a Specifications Centuri Processor Crate Net Bridge SB Micamp Rack Hood Free Socket Appendix B Connector DetailsDL 96-Pin Hood Varicon 56-pin PlugSocket25-way XLR 3-PinDIN 5-Pin Type MultipinMeter Inputs Analogue Appendix C Connector Pinouts C100 ConsoleMSD Diag Diagnostics / Remote Control Phase Scope DigitalExpansion Connector Pinouts Centuri ProcessorMachine Control TimecodeTtya TTYD, Ttyf Ttyh RS422 SerialTtye RS232 Mic in 1 Mic Input Card ‘908Analogue in / Analogue OUT Analogue I/O Card ‘904BNC Breakout Panel Digital I/O Card ‘902AES/EBU In 1-8 9-16, 17-24 AES/EBU Out 1-8 9-16, 17-24GPI Outputs 1 12 13 24, 25 36, 37 48, 49 GPI I/O Card ‘907Terminal Connector Pinouts NetBridgeNetBridge Diagnostic Cable Serial 1-8 RS232C100 Installation Guide Appendix D Audio Interfacing Connecting to Unbalanced EquipmentBalanced Circuits C100 Installation Guide Appendix E Environmental Specification +4dBu = 1.229V rms dBu = 0.775V rms. -6dBu = 0.388V rms Design Requirements for a Flightcase Appendix F Additional Information for Installing StageboxesThis page is blank intentionally Cables and Accessories by Part Description Appendix G Cables and accessoriesMiscellaneous/Hardware Description SSL Part No Video & SyncAppendix G Part Numbers More Notes