FireplaceXtrordinair 864 HH Fireplace Placement Requirements, Clearances, Raised Fireplaces

Page 11

Installation (for qualified installers only)

11

Fireplace Placement Requirements

The fireplace requires a 1/2" clearance from the angled sides and back of the fireplace to the framing members. No material (insulation, framing, etc.) may be placed into this area.

Fireplace must be installed on a level surface capable of supporting the fireplace and vent

Fireplace must be placed directly on wood or non-combustible surface (not on linoleum or carpet)

This heater may be placed in a bedroom. appliance produces when determining a

Please be aware of the large amount of heat this location.

Clearances

When installed, walls in front of the fireplace must be a minimum 1" to the side of the fireplace.

Due to the high temperature, the heater should be located out of traffic and away from furniture and draperies.

Fireplace must be placed so the vents below and above the glass do not become blocked.

Raised Fireplaces

The fireplace (and hearth, if desired) may be placed on a platform designed to support the fireplace (225 Lbs.) and vent.

Min. 49”

Fireplace

Enclosure

Height

Platform

Optional Raised Hearth

(see “Hearth Requirements” for details)

© Travis Industries

4080214

100-01182_003

Image 11
Contents HH Fireplace Massachusetts Approval OverviewListing Details IAS Icbo ApprovalTable of Contents Safety Warnings Safety PrecautionsSafety Precautions Dimensions Installation OptionsHeating Specifications Additional Items Required Installation OverviewRecommended Installation Procedure Packing ListRequirements for the Commonwealth of Massachusetts Massachusetts RequirementsConverting Fireplace to Top Vent Configuration Top Vent or Rear Vent ConfigurationDo not Over Tighten Screws Converting the Fireplace to Top VentRaised Fireplaces Fireplace Placement RequirementsClearances Minimum 49 Fireplace Enclosure Height Minimum Framing Dimensions Rear Vent ConfigurationMinimum Framing Dimensions Top Vent Configuration Nailing Brackets TOP ViewCorner Installations Rear Vent Configuration Corner Installations Top Vent Configuration Gas Inlet Pressure Gas Line RequirementsFuel Gas Line ConnectionLeft Side Gas Inlet preferred Gas Line LocationElectrical Connection required Wall Switch Installation Wall Switch or Thermostat InstallationWiring Diagram Millivolt System Altitude Considerations Vent RequirementsVent Clearances Approved Vent Vent InstallationRestrictor Position Approved Vent ConfigurationsExhaust Restrictor Adjustment Intake Restrictor Adjustment Diffuser Side View Diffuser Plate AdjustmentExhaust Restrictor Removal 0feet 5feet 22 max Feet 10feet 15feet Rear Vent Configuration with Vertical Termination Feet 21 max 5feet 10feet 15feet Top Vent Configuration with Horizontal TerminationTop Vent Configuration with Vertical Termination Termination Requirements Floor Mounted Fireplaces Hearth RequirementsFacing Requirements Drywall InstallationFacing Overview Optional Faceplates Sizing ChartFront View Raised Fireplace with no Hearth Front View Thick Facing with Fireplace Xtrordinair FPX Arched Faces Floor-Mounted Fireplace with Hearth Thick Facing Installation SideMantel Requirements Side View Installation Example Build-In with Horizontal Termination Pilot Flame Inspection Steps for Finalizing the InstallationStarting the Pilot Flame Air Shutter Adjustment Finalizing the Installation for qualified installers onlyRe-Attaching the Glass Frame Glass Frame Removal and InstallationFinalizing the Installation for qualified installers only Fireback and Grate Installation Right Log Installation Log Set InstallationRear Log Installation Left Log Installation Verify Rear LOG Position Right Twig InstallationEmber Installation Center Twig InstallationFront Twigs Installation LP Conversion Instructions Follow the directions below to replace the orifices Slotted Screwdriver Or T-20 Torx Upper Grill Installation Grill InstallationOption # 2 Remote Thermostat Remote Control Receiver Installation 2 OptionsOption # 1 Remote Thermostat Special Instructions for 864 HH Extra Room Power Heat Duct skuNew Wire Hook-Up Length = Installation OverviewMaximum Duct Length Duct Installation InstructionsFloor Mounting Attach the grill and wall adapter, if necessary Follow the directions below to wire the blower box Wiring Diagram -864TRVOFF Operating InstructionsAccent Light Installation sku Optional Equipment for qualified installers only Accent Light Operation Optional Wall-Mounted RheostatOptional Equipment for qualified installers only Index 68Index