Nailing Brackets
There are four nailing brackets on the front of the fireplace. Follow the directions below to prepare the nailing brackets. Once in place, nail or screw the nailing brackets to the framing.
NOTE: Additional nailing brackets are provided along the base of the fireplace. Use these brackets if not using the front brackets.
Make sure the fireplace is square and plumb when placed in the framing. Measured
1/2” Drywall
For installations using
1/2” facing fold the larger
tab out 90° (use a
screwdriver if necessary).
TOP VIEW
Fireplace
Framing
Nailing Bracket
Drywall
5/8” Drywall
For installations using 5/8” drywall fold the shorter tab out 90° (use a screwdriver if necessary).
TOP VIEW
Fireplace
Framing
Nailing Bracket
Drywall