Heat & Glo LifeStyle 8000TRD manual Hole and Vent Pipe

Page 22

WALL BRACKET

WALL STUD

NOTE: There must be NO INSULATION or other combustibles inside the framed firestop opening.

8 FT. (2.4m)

FLUE

OUTLET

1 INCH MIN.

(25.4mm)

HEAT SHIELD

INTERIOR

FIRESTOP

TRIM HEAT SHIELD IF TOO LONG, ADD TO SHIELD IF TOO SHORT

EXTERIOR

FIRESTOP

Figure 25. Installing Support Brackets

4. Install Firestops

For Horizontal Runs - Firestops are REQUIRED on both sides of a combustible wall through which the vent passes.

NOTE: Model DVK-01TRD does not need an exterior firestop on an exterior combustible wall.

To install firestops for horizontal runs that pass through either interior or exterior walls:

• Cut a 12” x 12” (305mm x 305mm) hole through the wall.

NOTE: The center of the hole is one (1) inch (25.4mm) above the center of the horizontal vent pipe.

Position the firestops on both sides of the hole previ- ously cut and secure the firestops with nails or screws.

The heat shields of the firestops MUST BE placed to- wards the top of the hole.

Continue the vent run through the firestops.

Figure 27. Heat Shield, Interior & Exterior Firestops

For Vertical Runs - One ceiling firestop is REQUIRED at the hole in each ceiling through which the vent passes.

To install firestops for vertical runs that pass through ceilings:

Position a plumb bob directly over the center of the verti- cal vent component.

Mark the ceiling to establish the centerpoint of the vent.

Drill a hole or drive a nail through this centerpoint.

Check the floor above for any obstructions, such as wir- ing or plumbing runs.

Reposition the fireplace and vent system, if necessary, to accommodate the ceiling joists and/or obstructions.

Cut an 11-inch X 11-inch (280mm X 280mm) hole through the ceiling, using the centerpoint previously marked.

Frame the hole with framing lumber the same size as the ceiling joists.

12"

(305mm)

12"

(305mm)

1" (25.4 mm)

VENT PIPE

11" (280 mm)

NEW

FRAMING

MEMBERS

CEILING

11" (280mm)

CHIMNEY

HOLE

EXISTING CEILING JOISTS

Figure 26. 12" x 12" Hole and Vent Pipe

22

Figure 28. 11" x 11" Hole & New Framing Members

Image 22 Contents
Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents 18 9 Log Set Assembly 8000TRDStanding Pilot Ignition / D’ALLUMAGE PAR Veilleuse Service Parts List / Liste des pièces de rechange 8000TRDCommon Parts / Piéces Communes IPI Ignition Allumage IPIAppliance Certification Installation CodesHigh Altitude Installations CertificationIntroducing the Heat-N-Glo Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the 8000TRD Clearance Requirements Constructing the Fireplace ChaseLocating the Fireplace Space RequirementsFraming Dimensions Framing the Fireplace187mm 149mm 220mm DV-90D 164mm 216mm Identifying Vent Components Installing the Vent SystemVent System Approvals Terminations KitsMAX .4 M Flue Restrictor InstructionsVertical Venting Break HereChart Venting with ONE 1 90 Elbow Venting with One 90 ElbowVenting with TWO Elbows MIN MAX mm 610mm MAX .22m 914mm MAX .86m MAX .4m Venting with Three 3 90 Elbows Venting with three 90 elbows+ H 1 FT Stove Cement Must be Placed around Installing Vent Components5 Inch 127 MM Fireplace Starting COL Install Support Brackets To Install the Heat ShieldContinue Adding Vent Components 12 Hole and Vent Pipe Positioned SO That the Arrow is Pointing UP Vent Termination4 184mm Vent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Gas Control Systems Vice Must be Wired Directly to the FIRE- Place Junction BOXPositioning, Leveling, and Securing the Fireplace Standing Pilot Ignition SystemCheck for GAS Leaks Gas Supply LineGas Pressure Requirements Natural Gas PropaneOptional fan and remote control kits require that Wiring the FireplaceOptional Accessories Position the wall switch in the desired position on a wallOperation using Battery Power Black Optional Battery BACK-UP RED BrownFinishing Sealant Material Hearth ExtensionsShutter Settings Burner Placing the Ember Material Installing Trim, Logs, and Ember MaterialInstalling the Trim Outlet Grilles in ANY MannerDouble-check for faulty components After the InstallationGlass Specifications 8000TRD 26 1/2 X 42 1/2 Tempered Before Lighting the FireplaceImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace MaintenanceCleaning Glass Door Replacing old ember material