Heat & Glo LifeStyle 8000TRD manual Installing Vent Components, Stove Cement Must be Placed around

Page 20

B. Installing Vent Components

After determining which set of starting collars will be used (top or rear), follow venting instructions accordingly.

Venting Out the Rear Vent

Remove the installed rear seal cap from the rear starting collars by cutting the strap at each end. (see Figure 18). Follow the vent configuration tables accordingly.

Remove the insulation from the REAR five inch flue, pull the heat shield out from outside of the firebox.

WARNING: THE TOP HEAT SHIELD (INSIDE

!THE FIREBOX) MUST REMAIN ATTACHED IF THE VENT SYSTEM IS ATTACHED TO THE REAR STARTING COLLARS. SEE FIGURE 18.

Venting Out the Top Vent

Remove the top vent collar seal cap and two pieces of insulation inside the top two starting collars (See Fig- ure 18).

Remove the heat shield from inside the TOP five inch flue from outside of the firebox.

WARNING: THE REAR VENT COLLAR SEAL

!CAP MUST REMAIN ATTACHED TO THE REAR VENT COLLARS IF THE VENT SYSTEM IS AT- TACHED TO THE TOP STARTING COLLARS.

WARNING: FAILURE TO REMOVE INSULATION

!IN THE SET OF COLLARS YOU ARE USING COULD CAUSE A FIRE.

!WARNING: YOU MUST LEAVE THE INSULATION IN PLACE IN THE SET OF COLLARS YOU ARE NOT USING.

If your vertical vent component is over 10 feet, you may want to install the vertical baffle (located in the bag containing the install manual) to improve flame appearance. Center the vertical baffle on the 5” flue being used, and with self tapping screws secure the baffle to the inside of the firebox.

Venting Out Rear

Venting Out Top

1. Attach the First Vent Component to Starting Collars

To attach the first vent component to the starting collars of the fireplace:

Apply a 3/8 inch (9.5mm) bead of stove cement around the 5 inch (127mm) fireplace starting collar.

Make sure that the fiberglass gasket supplied in the man- ual bag seals between the first 8-5/8 inch (219mm) vent component and the outer fireplace wrap. Using 2 self- tapping screws from the manual bag, secure that gasket to the outer wrap (see Figure 19).

OUTER

FIRST VENT

WRAP

COMPONENT

FIBERGLASS

GASKET

Figure 19. Fiberglass Gasket

Lock the vent components into place by sliding the con- centric pipe sections with four (4) equally spaced interior beads into the fireplace collar or previously installed com- ponent end with four (4) equally spaced indented sections.

When the internal beads of each 8-5/8 inch (219mm) outer pipe line up, rotate the pipe section clockwise about one-quarter (1/4) turn. The vent pipe is now locked together.

The first 90° elbow installed in the vent system of a rear venting fireplace MUST BE in a vertical position.

STARTING

COLLAR

HEAT

SHIELD

DISCARD

INSULATION

and

HEAT SHIELD

SEAL

SEAL

 

CAP

CAP

 

 

INSULATION

 

 

DISCARD BOTH

 

 

PIECES and

 

 

HEAT SHIELD

HEAT

 

 

SHIELD

CUT

HERE

STOVE

SEALANT

BEAD

FIRST VENT

COMPONENT

1 INCH

Figure 20.(25.4mm) Attaching First Vent Component to Starting Collars

!

WARNING: A 3/8 INCH (9.5 MM) BEAD OF

Cut the seal cap

strap and remove white

gasket material.

Figure 18

STOVE CEMENT MUST BE PLACED AROUND

THE 5 INCH (127 MM) FIREPLACE STARTING COL-

LAR BEFORE ATTACHING THE FIRST VENT COM- PONENT. FAILURE TO SEAL THIS JOINT MAY CAUSE THE FIREPLACE TO OPERATE IMPROPERLY.

20

Image 20
Contents Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents 18 9 Log Set Assembly 8000TRDService Parts List / Liste des pièces de rechange 8000TRD Common Parts / Piéces CommunesStanding Pilot Ignition / D’ALLUMAGE PAR Veilleuse IPI Ignition Allumage IPIInstallation Codes High Altitude InstallationsAppliance Certification CertificationANY Such Action MAY Possibly Cause a Fire Hazard Pre-install PreparationIntroducing the Heat-N-Glo Gas Fireplaces Diagram of the 8000TRD Constructing the Fireplace Chase Locating the FireplaceClearance Requirements Space RequirementsFraming Dimensions Framing the Fireplace187mm 149mm 220mm DV-90D 164mm 216mm Installing the Vent System Vent System ApprovalsIdentifying Vent Components Terminations KitsFlue Restrictor Instructions Vertical VentingMAX .4 M Break HereChart Venting with ONE 1 90 Elbow Venting with One 90 ElbowVenting with TWO Elbows MIN MAX mm 610mm MAX .22m 914mm MAX .86m MAX .4m Venting with Three 3 90 Elbows Venting with three 90 elbows+ H 1 FT 5 Inch 127 MM Fireplace Starting COL Installing Vent ComponentsStove Cement Must be Placed around Continue Adding Vent Components To Install the Heat ShieldInstall Support Brackets 12 Hole and Vent Pipe 4 184mm Vent TerminationPositioned SO That the Arrow is Pointing UP Vent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Vice Must be Wired Directly to the FIRE- Place Junction BOX Positioning, Leveling, and Securing the FireplaceGas Control Systems Standing Pilot Ignition SystemGas Supply Line Gas Pressure RequirementsCheck for GAS Leaks Natural Gas PropaneWiring the Fireplace Optional AccessoriesOptional fan and remote control kits require that Position the wall switch in the desired position on a wallOperation using Battery Power Black Optional Battery BACK-UP RED BrownFinishing Sealant Material Hearth ExtensionsInstalling Trim, Logs, and Ember Material Installing the TrimShutter Settings Burner Placing the Ember Material Outlet Grilles in ANY MannerAfter the Installation Glass Specifications 8000TRD 26 1/2 X 42 1/2 TemperedDouble-check for faulty components Before Lighting the FireplaceFireplace Maintenance Cleaning Glass DoorImportant Turn OFF the GAS Before Servicing Your Fireplace Replacing old ember material