Step 2. Framing the Fireplace

Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommo- date wall coverings and fireplace facing material. The dia- gram below shows framing reference dimensions.

Shows center of 12” x 12” vent framing holes for top and rear venting. The center of the hole is one (1) inch (25.4mm) above the center of the horizontal vent pipe.

CAUTION: MEASURE FIREPLACE DIMENSIONS AND VERIFY FRAMING METHODS AND WALL COVERING DETAILS BEFORE FRAMING.

A.

.............

49”*

B.

......... 40

1/2”

C.

...............

22”

D.

......... 43

1/8”

E.

......... 30

1/8”

Framing should be constructed of 2 X 4 lumber or heavier.

 

 

B

E

D

C

 

 

 

A

1/2” CLEARANCE FROM BACK OF FIREPLACE TO COMBUSTIBLE

1/2” CLEARANCE FROM BOTH SIDES OF FIREPLACE TO COMBUSTIBLE

FRAMING

MEMBER

0” CLEARANCE

0” CLEARANCE TO

FRAMING MEMBER

u

Figure 3. Framing Dimensions

10

Image 10
Contents Installers Guide What to do if you smell gasSafety and Warning Information Table of Contents 18 9 Log Set Assembly 8000TRDStanding Pilot Ignition / D’ALLUMAGE PAR Veilleuse Service Parts List / Liste des pièces de rechange 8000TRDCommon Parts / Piéces Communes IPI Ignition Allumage IPIAppliance Certification Installation CodesHigh Altitude Installations CertificationIntroducing the Heat-N-Glo Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the 8000TRD Clearance Requirements Constructing the Fireplace ChaseLocating the Fireplace Space RequirementsFraming Dimensions Framing the Fireplace187mm 149mm 220mm DV-90D 164mm 216mm Identifying Vent Components Installing the Vent SystemVent System Approvals Terminations KitsMAX .4 M Flue Restrictor InstructionsVertical Venting Break HereChart Venting with ONE 1 90 Elbow Venting with One 90 ElbowVenting with TWO Elbows MIN MAX mm 610mm MAX .22m 914mm MAX .86m MAX .4m Venting with Three 3 90 Elbows Venting with three 90 elbows+ H 1 FT Stove Cement Must be Placed around Installing Vent Components5 Inch 127 MM Fireplace Starting COL Install Support Brackets To Install the Heat ShieldContinue Adding Vent Components 12 Hole and Vent Pipe Positioned SO That the Arrow is Pointing UP Vent Termination4 184mm Vent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Gas Control Systems Vice Must be Wired Directly to the FIRE- Place Junction BOXPositioning, Leveling, and Securing the Fireplace Standing Pilot Ignition SystemCheck for GAS Leaks Gas Supply LineGas Pressure Requirements Natural Gas PropaneOptional fan and remote control kits require that Wiring the FireplaceOptional Accessories Position the wall switch in the desired position on a wallOperation using Battery Power Black Optional Battery BACK-UP RED BrownFinishing Sealant Material Hearth ExtensionsShutter Settings Burner Placing the Ember Material Installing Trim, Logs, and Ember MaterialInstalling the Trim Outlet Grilles in ANY MannerDouble-check for faulty components After the InstallationGlass Specifications 8000TRD 26 1/2 X 42 1/2 Tempered Before Lighting the FireplaceImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace MaintenanceCleaning Glass Door Replacing old ember material