Heat & Glo LifeStyle 8000TRD manual Table of Contents

Page 3

TABLE OF CONTENTS

 

Safety and Warning Information

2

Service Parts Lists

4

Section 1: Approvals and Codes

6

Appliance Certification

6

Installation Codes

6

u High Altitude Installations

6

Section 2: Getting Started

7

Introducing the Heat-N-Glo Gas Fireplaces

7

Pre-installation Preparation

7

Section 3: Installing the Fireplace

9

Constructing the Fireplace Chase

9

Step 1

Locating the Fireplace

9

u Step 2

Framing the Fireplace

10

Step 3

Installing the Vent System

12

 

A. Vent System Approvals

12

 

B. Installing Vent Components

20

 

C. Vent Termination

23

Step 4

Positioning, Leveling, and

 

 

Securing the Fireplace

26

u Step 5

The Gas Control Systems

26

Step 6

The Gas Supply Line

27

Step 7

Gas Pressure Requirements

27

Step 8

Wiring the Fireplace

28

Step 9

Finishing

30

Step 10 Installing Trim, Logs, and Ember Material

31

 

Installing the Trim

31

 

Positioning the Logs

31

 

Shutter Settings

31

 

Placing the Ember Material

31

 

Glass Specifications

32

u Step 11

Before Lighting the Fireplace

32

Step 12

Lighting the Fireplace

32

After the Installation

32

u Section 4: Maintaining and Servicing Your Fireplace

33

u= Contains updated information.

3

Image 3
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents 8000TRD 18 9 Log Set AssemblyIPI Ignition Allumage IPI Service Parts List / Liste des pièces de rechange 8000TRDCommon Parts / Piéces Communes Standing Pilot Ignition / D’ALLUMAGE PAR VeilleuseCertification Installation CodesHigh Altitude Installations Appliance CertificationPre-install Preparation Introducing the Heat-N-Glo Gas FireplacesANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the 8000TRD Space Requirements Constructing the Fireplace ChaseLocating the Fireplace Clearance RequirementsFraming the Fireplace Framing Dimensions187mm 149mm 220mm DV-90D 164mm 216mm Terminations Kits Installing the Vent SystemVent System Approvals Identifying Vent ComponentsBreak Here Flue Restrictor InstructionsVertical Venting MAX .4 MChart Venting with One 90 Elbow Venting with ONE 1 90 ElbowVenting with TWO Elbows MIN MAX mm 610mm MAX .22m 914mm MAX .86m MAX .4m Venting with three 90 elbows Venting with Three 3 90 Elbows+ H 1 FT Installing Vent Components Stove Cement Must be Placed around5 Inch 127 MM Fireplace Starting COL To Install the Heat Shield Install Support BracketsContinue Adding Vent Components 12 Hole and Vent Pipe Vent Termination Positioned SO That the Arrow is Pointing UP4 184mm Vent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Standing Pilot Ignition System Vice Must be Wired Directly to the FIRE- Place Junction BOXPositioning, Leveling, and Securing the Fireplace Gas Control SystemsNatural Gas Propane Gas Supply LineGas Pressure Requirements Check for GAS LeaksPosition the wall switch in the desired position on a wall Wiring the FireplaceOptional Accessories Optional fan and remote control kits require thatBlack Optional Battery BACK-UP RED Brown Operation using Battery PowerSealant Material Hearth Extensions FinishingOutlet Grilles in ANY Manner Installing Trim, Logs, and Ember MaterialInstalling the Trim Shutter Settings Burner Placing the Ember MaterialBefore Lighting the Fireplace After the InstallationGlass Specifications 8000TRD 26 1/2 X 42 1/2 Tempered Double-check for faulty componentsReplacing old ember material Fireplace MaintenanceCleaning Glass Door Important Turn OFF the GAS Before Servicing Your Fireplace