Heat & Glo LifeStyle 8000TRD manual Minimum Height from Roof to Lowest Discharge Opening

Page 25

For Vertical Terminations - To locate the vent and install the vent sections:

• Locate and mark the vent centerpoint on the underside

of the roof, and drive a nail through the centerpoint.

• Make the outline of the roof hole around the centerpoint

nail.

• The size of the roof hole framing dimensions depend on the

pitch of the roof. There MUST BE a 1-inch (25.4mm) clear-

ance from the vertical vent pipe to combustible materials.

• Mark the roof hole accordingly.

To seal the roof hole, and to divert rain and snow from the vent system:

Attach a flashing to the roof using nails, and use a non- hardening mastic around the edges of the flashing base where it meets the roof.

Attach a storm collar over the flashing joint to form a water-tight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.

Slide the termination cap over the end of the vent pipe and rotate the pipe clockwise 1/4 turn.

• Cover the opening of the installed vent pipes.

• Cut and frame the roof hole.

• Use framing lumber the same size as the roof rafters

and install the frame securely. Flashing anchored to the

frame must withstand heavy winds.

• Continue to install concentric vent sections up through

the roof hole (for inside vent installations) or up past the

roof line until you reach the appropriate distance above

the roof (for outside terminations).

2 FT.

2 FT. MIN.

MIN.

 

 

LOWEST

 

DISCHARGE

TERMINATION

OPENING

 

CAP

 

HORIZONTAL

OVERHANG

VERTICAL

WALL

X

12

!WARNING: MAJOR U.S. BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR

VENT HEIGHT ABOVE THE ROOF TOP. THESE MIN- IMUM HEIGHTS ARE NECESSARY IN THE INTER- EST OF SAFETY. SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMI- NATION CAP IS AT LEAST TWO (2) FEET FROM A VERTICAL WALL AND 2-FEET BELOW A HORIZON- TAL OVERHANG.

NOTE: This also pertains to vertical vent systems in- stalled on the outside of the building.

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF

TO LOWEST DISCHARGE OPENING

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 33. Minimum Height from Roof to Lowest Discharge Opening

25

Image 25
Contents What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents 8000TRD 18 9 Log Set AssemblyCommon Parts / Piéces Communes Service Parts List / Liste des pièces de rechange 8000TRDStanding Pilot Ignition / D’ALLUMAGE PAR Veilleuse IPI Ignition Allumage IPIHigh Altitude Installations Installation CodesAppliance Certification CertificationIntroducing the Heat-N-Glo Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the 8000TRD Locating the Fireplace Constructing the Fireplace ChaseClearance Requirements Space RequirementsFraming the Fireplace Framing Dimensions187mm 149mm 220mm DV-90D 164mm 216mm Vent System Approvals Installing the Vent SystemIdentifying Vent Components Terminations KitsVertical Venting Flue Restrictor InstructionsMAX .4 M Break HereChart Venting with One 90 Elbow Venting with ONE 1 90 ElbowVenting with TWO Elbows MIN MAX mm 610mm MAX .22m 914mm MAX .86m MAX .4m Venting with three 90 elbows Venting with Three 3 90 Elbows+ H 1 FT Stove Cement Must be Placed around Installing Vent Components5 Inch 127 MM Fireplace Starting COL Install Support Brackets To Install the Heat ShieldContinue Adding Vent Components 12 Hole and Vent Pipe Positioned SO That the Arrow is Pointing UP Vent Termination4 184mm Vent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Positioning, Leveling, and Securing the Fireplace Vice Must be Wired Directly to the FIRE- Place Junction BOXGas Control Systems Standing Pilot Ignition SystemGas Pressure Requirements Gas Supply LineCheck for GAS Leaks Natural Gas PropaneOptional Accessories Wiring the FireplaceOptional fan and remote control kits require that Position the wall switch in the desired position on a wallBlack Optional Battery BACK-UP RED Brown Operation using Battery PowerSealant Material Hearth Extensions FinishingInstalling the Trim Installing Trim, Logs, and Ember MaterialShutter Settings Burner Placing the Ember Material Outlet Grilles in ANY MannerGlass Specifications 8000TRD 26 1/2 X 42 1/2 Tempered After the InstallationDouble-check for faulty components Before Lighting the FireplaceCleaning Glass Door Fireplace MaintenanceImportant Turn OFF the GAS Before Servicing Your Fireplace Replacing old ember material