Heat & Glo LifeStyle 8000TRD manual Fireplace Maintenance, Replacing old ember material

Page 33

Maintaining and Servicing Your Fireplace

Fireplace Maintenance

Although the frequency of your fireplace servicing and main- tenance will depend on use and the type of installation, you should have a qualified service technician perform an appli- ance check-up at the beginning of each heating season. See the table below for specific guidelines regarding each fireplace maintenance task.

IMPORTANT: TURN OFF THE GAS BEFORE SERVICING YOUR FIREPLACE.

Replacing old ember material

Frequency: Once annually, during the checkup.

By: Qualified service technician.

Task: Brush away loose ember material near the burner. Replace old ember material. New ember material should be placed alternately on top of the burner. Save the remaining ember material and repeat this procedure at your next servicing. For more information, see Placing Ember Material.

Cleaning Burner and Controls Frequency: Once annually. By: Qualified service technician.

Task: Brush or vacuum the control compartment, fireplace logs and burner areas surrounding the logs.

uCleaning Flame Sensor Rod (IPI Systems) Frequency: Periodically.

By: Qualified service technician.

Task: Make a visual check of the straight flame sensor rod (see Figure 35). Use steel wool or fine sandpaper to carefully remove any existing white deposits.

Checking Flame Patterns, Flame Height Frequency: Periodically.

By: Qualified service technician/Home owner.

Task: Make a visual check of your fireplace’s flame patterns. Make sure the flames are steady - not lifting or floating. See Figure 44. The flame sensor (IPI) or thermopile/ thermocouple (standing pilot) tips should be covered with flame. See Figure 35.

MAKE SURE THE FLAMES

ARE STEADY—NOT

LIFTING OR FLOATING.

Figure 44. Burner Flame Patterns

Checking Vent System

Frequency: Before initial use and at least annually thereafter, more frequently if possible.

By: Qualified service technician/Home owner.

Task: Inspect the external vent cap on a regular basis to ensure that no debris is interfering with the flow of air. Inspect entire vent system for proper function.

Cleaning Glass Door

Frequency: After the first 3 to 4 hours of use. As neces- sary after initial cleaning.

By: Home owner.

Task: Remove and clean glass after the first 3 to 4 hours of use. After the initial cleaning, clean as necessary, particu- larly after adding new ember (flame colorant) material. Film deposits on the inside of the glass door should be cleaned off using a household glass cleaner. NOTE: DO NOT handle or attempt to clean the door when it is hot and DO NOT use abrasive cleaners.

33

Image 33 Contents
What to do if you smell gas Installers GuideSafety and Warning Information Table of Contents 8000TRD 18 9 Log Set AssemblyCommon Parts / Piéces Communes Service Parts List / Liste des pièces de rechange 8000TRDStanding Pilot Ignition / D’ALLUMAGE PAR Veilleuse IPI Ignition Allumage IPIHigh Altitude Installations Installation CodesAppliance Certification CertificationPre-install Preparation Introducing the Heat-N-Glo Gas FireplacesANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the 8000TRD Locating the Fireplace Constructing the Fireplace ChaseClearance Requirements Space RequirementsFraming the Fireplace Framing Dimensions187mm 149mm 220mm DV-90D 164mm 216mm Vent System Approvals Installing the Vent SystemIdentifying Vent Components Terminations KitsVertical Venting Flue Restrictor InstructionsMAX .4 M Break HereChart Venting with One 90 Elbow Venting with ONE 1 90 ElbowVenting with TWO Elbows MIN MAX mm 610mm MAX .22m 914mm MAX .86m MAX .4m Venting with three 90 elbows Venting with Three 3 90 Elbows+ H 1 FT Installing Vent Components Stove Cement Must be Placed around5 Inch 127 MM Fireplace Starting COL To Install the Heat Shield Install Support BracketsContinue Adding Vent Components 12 Hole and Vent Pipe Vent Termination Positioned SO That the Arrow is Pointing UP4 184mm Vent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Positioning, Leveling, and Securing the Fireplace Vice Must be Wired Directly to the FIRE- Place Junction BOXGas Control Systems Standing Pilot Ignition SystemGas Pressure Requirements Gas Supply LineCheck for GAS Leaks Natural Gas PropaneOptional Accessories Wiring the FireplaceOptional fan and remote control kits require that Position the wall switch in the desired position on a wallBlack Optional Battery BACK-UP RED Brown Operation using Battery PowerSealant Material Hearth Extensions FinishingInstalling the Trim Installing Trim, Logs, and Ember MaterialShutter Settings Burner Placing the Ember Material Outlet Grilles in ANY MannerGlass Specifications 8000TRD 26 1/2 X 42 1/2 Tempered After the InstallationDouble-check for faulty components Before Lighting the FireplaceCleaning Glass Door Fireplace MaintenanceImportant Turn OFF the GAS Before Servicing Your Fireplace Replacing old ember material
Related manuals
Manual 33 pages 3.26 Kb