proper sealing. Be sure to always attach straps on up- per elbow to a structural framing member.

For vertical installations, continue installing the pipe as required until pipe is installed up through the ceiling. At this point, you must install a firestop spacer.

Chateau™ Direct Vent Gas Fireplace

Vent must rise a minimum of 2’ (610 mm) before offset is used.

Termination height must conform to roof clearance as specified in Figure 37.

Pipe Section

 

Pipe

UP

Rim

 

 

Hem

 

Lance

 

Pipe

 

Rim

FP1468

Fig. 12 Install pipe, listening for the snap-lock to fasten.

Horizontal Termination

The vent must rise vertically a minimum of 24”

(610 mm) off the top of the unit, before the first elbow. The horizontal run may extend up to 20’ (6 m) and include a vertical rise of up to 40’ (12 m). (Fig. 14) Hori- zontal termination must also meet the criteria shown in Figures 10 & 11.

Approved vent systems must terminate above and including the heavy line in Figure 13.

Two 45° elbows may be substituted for each single 90° elbow.

With a rise between 2’ - 4’, one (1) 90° or two (2) 45° elbows may be used.

Vertical Run (in feet) (Measured from the appliance flue collar to the top of the vent pipe.)

May use one (1) elbow only

��

 

��

 

��

 

��

 

��

 

��

 

��

 

��

 

��

 

��

 

��

 

��

 

��

 

��

May use up to

��

three (3) 90°

��

elbows, but must

 

��

not have two (2)

��

consecutive 90°

��

elbows in horizon-

��tal plane

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

��

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

���

 

 

 

 

 

 

 

 

 

 

 

Unacceptable vent-

 

���

 

 

 

 

 

 

 

 

ing configuration

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

� � � � � � � � � �� �� �� �� �� �� �� �� �� �� ��

Vertical Termination

Horizontal Run (in feet)

FP1359a

A vertical vent system must terminate no less than 12’ (3.66 m) and no more than 40’ (12 m) above the appli- ance flue collar. A 2’ (610 mm) vertical section must be installed before any offset. A maximum of 20’ (6.1 m) horizontal and three (3) 90° elbows may be installed with a minimum of 12’ (3.66 m) vertical section above the flue collar of the unit. Refer to Page 18, Figure 14 for more information.

A vertically terminated vent system must also conform to the following criteria:

No more than three (3) 90° elbows may be used.

Two (2) 45° elbows may be substituted for one (1) 90° elbow. No more than six (6) elbows may be used.

Fig. 13 Horizontal vent termination window.

Sidewall Applications

Since it is very important that the vent- ing system maintain its balance between the combustion air intake and the flue gas exhaust, certain limitations as to vent configurations apply and must be strictly adhered to.

The vent graph showing the relationship between verti- cal and horizontal side wall venting will help to deter- mine the various dimensions allowable.

Minimum clearance between vent pipes and combustible materials is 3¹⁄” (89 mm) on top, 2¹⁄” (64 mm) on both sides and 1¹⁄” (38 mm) on the bottom.

20011957

17

Image 17
Contents What to do if YOU Smell GAS INSTALLER/CONSUMER Safety InformationTable of Contents Certified To Installation & Operating InstructionsAnsi Z21.50b-2005 / CSA 2.22b-2005 Vented Gas Fireplace Please Review the Following CarefullyStandard Framing Locating Your FireplaceMantels Clearance to CombustiblesFraming and Finishing HearthFinal Finishing Gas SpecificationsGas Inlet and Manifold Pressures Gas Line InstallationHigh Elevations Electrical Junction BoxControl System Control System InstallationChateau Direct Vent Gas Fireplace Special Feature for Cold ClimatesKey Settings Remote Control Transmitter Operating InstructionsIntroduction LCD Liquid Crystal DisplayThermostat Function Manual FunctionSetting LOCK-OUT CP Continuous Pilot FeatureCP Childproof Feature Operational Notes Thermostatic Updating FeatureLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2General Information Assembling Vent Pipes SK8 Venting Pipes Canadian InstallationsUSA Installations Sidewall Applications Horizontal TerminationVertical Termination Step Sidewall InstallationZero clearance sleeve is only required for combustible walls Always install horizontal venting on a level planeHorizontal length requirement Sidewall Installation with Stationary Glass Facing OutsideInstalling the 38S2VDK Door Installation ProcedureRestrictor Plate Installation Flue Restrictor Plate InstallationFlue Restrictor Plate Guide Typical ApplicationsFlue restrictor plate use in straight up installation + 2 + 3 + 4 = Vertical Through-the-Roof InstallationMin Component Description Model Number Chimney ComponentsGlass Cleaning Glass Frame Assembly RemovalCeramic Refractory Installation Clean the glass after the first two weeks of operationDVT38Sw log identification Log, Lava Rock and Ember PlacementLog Pilot Plumbing F50 Overlay is very fragile Log Right Flame Characteristics Trim Installation Turning Off the Gas to the Appliance Lighting & Operating InstructionsLighting Instructions Operation TroubleshootingAmerican Flame Gas Control System Troubleshooting American Flame Gas Control System What to Check American Flame Gas Control System Error CodesFuel Conversion Instructions Conversion PrecautionsConversion Procedure Remove pilot orifice DVT38S2 Injector Orifice Size Matrix Pilot Flame AdjustmentValve Minimum Rate Screw Conversion to LPBurner and Burner Compartment MaintenanceCleaning the Control System DVT38S2 Units GFYW5Q0 DVT38S2 DVT38S2Fuel Conversion Kits Back-up Battery Kit AccessoriesChateau Direct Vent Gas Fireplace Product Covered by this Warranty Limited Lifetime WarrantyModel EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings