Vermont Casting DVT38S2IN Zero clearance sleeve is only required for combustible walls

Page 19

Vent Opening for Combustible Wall

16¹⁄

(413mm)

16¹⁄

 

 

 

 

 

 

Framing

 

 

 

 

Detail

(413mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fireplace Hearth

Vent Opening for Noncombustible Wall

11¹⁄

(286mm)

VO584-100

Fig. 18 Locate vent opening on wall.

STEP 2

Measure wall thickness and cut zero clearance sleeve parts to proper length (MAXIMUM 12”/305 mm). As- semble sleeve using #8 sheet metal screws (supplied). (Fig. 19) Install firestop assembly. (Fig. 34)

Zero clearance sleeve is only required for combustible walls.

Adjustable Zero

 

Clearance Sleeve

Max. Length

 

12” (305mm)

 

#8 Screws (2)

#8 Screws (2)

 

 

ZCS101a

Fig. 19 Adjustable zero clearance sleeve.

 

STEP 3

Slide the zero clearance sleeve through the wall and install the firestop on the inside surface of the wall. Secure with four (4) #8 sheet metal screws.

STEP 4

Place fireplace into position. (Fig. 20) Measure the ver- tical height (X) required from the base of the flue collars to the center of the wall opening. NOTE: If using the SK8DVSK Kit, the vertical section of pipe is telescopic and could provide adjustment from 24” up to 40” (610 mm to 1016 mm).

Chateau™ Direct Vent Gas Fireplace

Firestop

Zero Clear-

ance Sleeve

X

FP1456

Fig. 20 Vertical height requirement.

STEP 5

Tape the inner and outer flue collars of the fireplace using UL approved metal adhesive tape to ensure the joints are sealed. Attach an appropriate length of vent pipe to the fireplace. Follow with the installation of the inner and outer elbow, tape elbow joints and secure joints as described on Page 16.

STEP 6

Measure the horizontal length requirement including a 2” (51 mm) overlap, ie from the elbow to the outside wall face plus 2” (51 mm) (or the distance required if installing a second 90° elbow). (Fig. 21)

Always install horizontal venting on a level plane.

STEP 7

Use appropriate length of pipe sections and install the horizontal vent sections. You may need to cut 1’ wall section to size to be flush with the outside wall. The sections which go through the wall are packaged with the starter kit, and can be cut to suit if necessary. (Fig. 22)

Sealing firestop gaps with high temperature sealant will restrict cold air being drawn in around fire- place.

STEP 8

Guide the vent terminations 8” and 11” collars into their respective vent pipes. Double check that the vent pipes overlap the collars by 2” (51 mm). Secure the termina- tion to the wall with screws provided and caulk around the wall plate to weatherproof. (Fig. 23) As an alterna- tive to screwing the termination directly to the wall you may also use expanding plugs or an approved exterior construction adhesive.

20011957

19

Image 19
Contents What to do if YOU Smell GAS INSTALLER/CONSUMER Safety InformationTable of Contents Please Review the Following Carefully Installation & Operating InstructionsCertified To Ansi Z21.50b-2005 / CSA 2.22b-2005 Vented Gas FireplaceStandard Framing Locating Your FireplaceMantels Clearance to CombustiblesGas Specifications HearthFraming and Finishing Final FinishingElectrical Junction Box Gas Line InstallationGas Inlet and Manifold Pressures High ElevationsControl System Control System InstallationChateau Direct Vent Gas Fireplace Special Feature for Cold ClimatesLCD Liquid Crystal Display Remote Control Transmitter Operating InstructionsKey Settings IntroductionThermostat Function Manual FunctionCP Childproof Feature Continuous Pilot FeatureSetting LOCK-OUT CP Operational Notes Thermostatic Updating FeatureLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2USA Installations Canadian InstallationsGeneral Information Assembling Vent Pipes SK8 Venting Pipes Vertical Termination Horizontal TerminationSidewall Applications Step Sidewall InstallationZero clearance sleeve is only required for combustible walls Always install horizontal venting on a level planeHorizontal length requirement Sidewall Installation with Stationary Glass Facing OutsideInstalling the 38S2VDK Door Installation ProcedureTypical Applications Flue Restrictor Plate InstallationRestrictor Plate Installation Flue Restrictor Plate GuideFlue restrictor plate use in straight up installation + 2 + 3 + 4 = Vertical Through-the-Roof InstallationMin Component Description Model Number Chimney ComponentsClean the glass after the first two weeks of operation Glass Frame Assembly RemovalGlass Cleaning Ceramic Refractory InstallationDVT38Sw log identification Log, Lava Rock and Ember PlacementLog Pilot Plumbing F50 Overlay is very fragile Log Right Flame Characteristics Trim Installation Lighting Instructions Lighting & Operating InstructionsTurning Off the Gas to the Appliance American Flame Gas Control System TroubleshootingOperation Troubleshooting American Flame Gas Control System What to Check American Flame Gas Control System Error CodesConversion Procedure Conversion PrecautionsFuel Conversion Instructions Remove pilot orifice Conversion to LP Pilot Flame AdjustmentDVT38S2 Injector Orifice Size Matrix Valve Minimum Rate ScrewCleaning the Control System MaintenanceBurner and Burner Compartment DVT38S2 Units GFYW5Q0 DVT38S2 DVT38S2Fuel Conversion Kits Back-up Battery Kit AccessoriesChateau Direct Vent Gas Fireplace Product Covered by this Warranty Limited Lifetime WarrantyModel EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings