Vermont Casting DVT38S2IN installation instructions Sidewall Installation, Step

Page 18

Chateau™ Direct Vent Gas Fireplace

When the vent termination exits through foundations less than 20” (508mm) below siding outcrop, the vent pipe must be flush with the siding.

It is always best to locate the fireplace in such a way that minimizes the number of offsets and horizontal vent length of vent pipe from the flue collar of the fire- place to the face of the outer wall.

Horizontal plane means no vertical rise exists on this portion of the vent assembly.

 

20’ (6m)

 

 

 

Unitized Elbow

 

 

 

(SK890)

 

 

 

 

 

Pipe

 

 

 

Straps

(4.3m)

 

 

Every 3’

Pipe Straps

(914mm)

 

Every 3’

 

 

14’

 

 

(914mm)

Firestop/Zero

 

 

Minimum 2’

Clearance Sleeve

 

 

 

 

(610mm) Section

 

NOTE: Apply high temperature sealant or UL approved high temperature metal adhesive tape as directed on Page

16.

FP1453

Fig. 14 Support straps for horizontal runs.

The maximum number of 90° elbows per side wall installation is three (3), but must not have two (2) consecutive elbows in the horizontal plane.

A minimum of 2’ (610mm) vertical section off the top of the unit is required, an elbow and a 1’ (305mm) maximum horizontal run to get through a wall. (Fig. 15)

The maximum number of 45° elbows permitted per side wall installation is two (2). These elbows can be installed in either the vertical or horizontal run. (Fig. 15)

3'

(914mm)

 

A

10'

B

 

(3m)

 

 

A + B = 17' (5.2m)

FP1238b

Fig. 16 Maximum vent run with elbows.

For each 90° elbow installed in the horizontal run, the length of the horizontal run MUST be reduced by 36” (914 mm).

The maximum number of elbow degrees in a system is 270°. (Fig. 17)

Example:

 

 

 

 

 

 

 

 

 

 

Elbow 1

=

 

90°

 

 

 

 

 

Elbow 2

=

 

45°

4

 

Elbow 3

=

 

45°

 

 

 

 

 

Elbow 4

=

 

90°

 

 

 

 

Total angular variation =

270°

 

 

 

 

 

 

 

 

1

 

2

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FP1455

Fig. 17 Maximum number of elbow degrees.

2'

(610mm)

C Wall Opening

L

6'9���"

Sidewall Installation

STEP 1

Locate vent opening on the wall. It may be necessary

(2080mm)

FP1454

Fig. 15 Minimum vertical run / maximum horizontal run.

For each 45° elbow installed in the horizontal run, the length of the horizontal run MUST be reduced by 18” (45 cm). This does not apply if the 45° elbows are installed on the vertical part of the vent system.

to first position the fireplace and measure to obtain hole location. Depending on whether the wall is combustible or noncombustible, cut opening to size. (Fig. 18)

For combustible walls first frame in opening.

Combustible Walls: Cut a 16¹⁄”H x 16¹⁄” W (413 x 413 mm) hole through the exterior wall and frame as shown.

Noncombustible Walls: Hole opening must be 11¹⁄” (286 mm) in diameter.

18

20011957

Image 18
Contents INSTALLER/CONSUMER Safety Information What to do if YOU Smell GASTable of Contents Ansi Z21.50b-2005 / CSA 2.22b-2005 Vented Gas Fireplace Installation & Operating InstructionsCertified To Please Review the Following CarefullyLocating Your Fireplace Standard FramingClearance to Combustibles MantelsFinal Finishing HearthFraming and Finishing Gas SpecificationsHigh Elevations Gas Line InstallationGas Inlet and Manifold Pressures Electrical Junction BoxControl System Installation Control SystemSpecial Feature for Cold Climates Chateau Direct Vent Gas FireplaceIntroduction Remote Control Transmitter Operating InstructionsKey Settings LCD Liquid Crystal DisplayManual Function Thermostat FunctionContinuous Pilot Feature CP Childproof FeatureSetting LOCK-OUT CP Thermostatic Updating Feature Operational NotesGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationCanadian Installations USA InstallationsGeneral Information Assembling Vent Pipes SK8 Venting Pipes Horizontal Termination Vertical TerminationSidewall Applications Sidewall Installation StepAlways install horizontal venting on a level plane Zero clearance sleeve is only required for combustible wallsSidewall Installation with Stationary Glass Facing Outside Horizontal length requirementInstallation Procedure Installing the 38S2VDK DoorFlue Restrictor Plate Guide Flue Restrictor Plate InstallationRestrictor Plate Installation Typical ApplicationsFlue restrictor plate use in straight up installation Vertical Through-the-Roof Installation + 2 + 3 + 4 =Min Chimney Components Component Description Model NumberCeramic Refractory Installation Glass Frame Assembly RemovalGlass Cleaning Clean the glass after the first two weeks of operationLog, Lava Rock and Ember Placement DVT38Sw log identificationLog Pilot Plumbing F50 Overlay is very fragile Log Right Flame Characteristics Trim Installation Lighting & Operating Instructions Lighting InstructionsTurning Off the Gas to the Appliance Troubleshooting American Flame Gas Control SystemOperation Troubleshooting American Flame Gas Control System American Flame Gas Control System Error Codes What to CheckConversion Precautions Conversion ProcedureFuel Conversion Instructions Remove pilot orifice Valve Minimum Rate Screw Pilot Flame AdjustmentDVT38S2 Injector Orifice Size Matrix Conversion to LPMaintenance Cleaning the Control SystemBurner and Burner Compartment DVT38S2 Units GFYW5Q0 DVT38S2 DVT38S2Fuel Conversion Kits Accessories Back-up Battery KitChateau Direct Vent Gas Fireplace Limited Lifetime Warranty Product Covered by this WarrantyEfficiency Ratings Model EnerGuide Ratings Fireplace Efficiency %