Vermont Casting DVT38S2IN Glass Information, Glass Frame Assembly Removal, Glass Cleaning

Page 27

Chateau™ Direct Vent Gas Fireplace

Operating Instructions

Glass Information

Only glass approved by CFM Corporation should be used on this fireplace.

The use of any non-approved replacement glass will void all product warranties.

Care must be taken to avoid breakage of the glass.

Do not operate appliance with glass front removed, cracked or broken.

A replacement glass frame assembly (complete with gasket) is available through your CFM Corporation dealer and should only be installed by a licensed qualified service person.

�������

��������������

������������

������������������

�������������

��������������������

���������������

Glass Frame Assembly Removal

1.Turn the fireplace OFF (including the pilot).

2.If the unit has been operating allow time for the components to cool.

3.Using a Phillips screwdriver, unfasten two (2) screws located at the top of the glass frame. (Fig. 39)

4.Tilt the glass frame at the top away from the unit. Lift it carefully off the bottom door track and set on padded surface.

Phillips

Screws

FP1800

Fig. 39 Remove Phillips screws, tilt frame forward and lift off bottom door track.

Glass Cleaning

It is necessary to periodically clean the glass. During start-up, condensation, which is normal, forms on the inside of the glass. This condensation causes lint, dust and other airborne particles to cling to the glass surface.

Also initial paint curing may deposit a slight film on the glass. It is therefore recommended the glass be cleaned two or three times with a non-ammonia based household cleaner and warm water (gas fireplace glass cleaner is recommended) within the first few weeks of operation.

After the initial cleaning process the glass should be cleaned two or three times during each operating season depending on the environment in the house.

Clean the glass after the first two weeks of operation.

Ceramic Refractory Installation

The ceramic refractories are fragile and should be handled with care. Due to the size of the refractories, an assistant may be helpful.

 

Refractory,

 

 

Refractory,

 

 

 

Left Side

 

 

Right Side

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FP1580a

Fig. 40 Ceramic refractory panels.

1.Using a Robertson screwdriver, remove the two (2) nuts holding each fettle to the burner assembly.

2.Identify the side refractory. The refractory with the small cut out at the bottom must be installed on the side where the plumbing for the pilot and manifold are. The other side refractory has a larger cut out at the bottom. This is designed to allow the opening for the fresh air coming to the combustion chamber unobstructed. (Fig. 40)

3.Start with either the right side refractory or left side refractory. Hold the refractory at an angle. Slide and seat the bottom edge toward the bottom of the

20011957

27

Image 27
Contents What to do if YOU Smell GAS INSTALLER/CONSUMER Safety InformationTable of Contents Please Review the Following Carefully Installation & Operating InstructionsCertified To Ansi Z21.50b-2005 / CSA 2.22b-2005 Vented Gas FireplaceStandard Framing Locating Your FireplaceMantels Clearance to CombustiblesGas Specifications HearthFraming and Finishing Final FinishingElectrical Junction Box Gas Line InstallationGas Inlet and Manifold Pressures High ElevationsControl System Control System InstallationChateau Direct Vent Gas Fireplace Special Feature for Cold ClimatesLCD Liquid Crystal Display Remote Control Transmitter Operating InstructionsKey Settings IntroductionThermostat Function Manual FunctionContinuous Pilot Feature CP Childproof FeatureSetting LOCK-OUT CP Operational Notes Thermostatic Updating FeatureLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2Canadian Installations USA InstallationsGeneral Information Assembling Vent Pipes SK8 Venting Pipes Horizontal Termination Vertical TerminationSidewall Applications Step Sidewall InstallationZero clearance sleeve is only required for combustible walls Always install horizontal venting on a level planeHorizontal length requirement Sidewall Installation with Stationary Glass Facing OutsideInstalling the 38S2VDK Door Installation ProcedureTypical Applications Flue Restrictor Plate InstallationRestrictor Plate Installation Flue Restrictor Plate GuideFlue restrictor plate use in straight up installation + 2 + 3 + 4 = Vertical Through-the-Roof InstallationMin Component Description Model Number Chimney ComponentsClean the glass after the first two weeks of operation Glass Frame Assembly RemovalGlass Cleaning Ceramic Refractory InstallationDVT38Sw log identification Log, Lava Rock and Ember PlacementLog Pilot Plumbing F50 Overlay is very fragile Log Right Flame Characteristics Trim Installation Lighting & Operating Instructions Lighting InstructionsTurning Off the Gas to the Appliance Troubleshooting American Flame Gas Control SystemOperation Troubleshooting American Flame Gas Control System What to Check American Flame Gas Control System Error CodesConversion Precautions Conversion ProcedureFuel Conversion Instructions Remove pilot orifice Conversion to LP Pilot Flame AdjustmentDVT38S2 Injector Orifice Size Matrix Valve Minimum Rate ScrewMaintenance Cleaning the Control SystemBurner and Burner Compartment DVT38S2 Units GFYW5Q0 DVT38S2 DVT38S2Fuel Conversion Kits Back-up Battery Kit AccessoriesChateau Direct Vent Gas Fireplace Product Covered by this Warranty Limited Lifetime WarrantyModel EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings