Vermont Casting DVT38S2IN installation instructions Log Pilot Plumbing F50

Page 29

1.Ensure the four (4) screws that attach the fettle to the burner are secure.

2.Set the andirons in place by hooking the tabs on the back of the andirons over the webs of the fettle. (Fig. 42) Repeat process for and- irons on both sides of burner.

Figure 42

Burner

Housing

Chateau™ Direct Vent Gas Fireplace

Andirons

Fettle

FP1803

Burner Tubes

Figure 43

LG486

Ember Material

Lava Rock

 

Figure 44

3.Place the volcanic rock in front of each burner tube assembly and around the burner assembly as desired. (Fig. 43) Do not obstruct fresh air inlet with volcanic rock.

4.Place the ember material lightly, between each burner tube as- sembly and the burner housing, between the joined burner tubes and in front over the burner tube and on top of burner tube.

NOTE: The ember material must be built up from the burner tubes to the burner housing fronts in order for the burner tubes to light properly.

5.Position the log pilot plumb- ing. (Fig. 44) Hold the log with the two (2) branches facing down and set it down over the pilot plumbing with the flat side of the log touching the side refractory.

Log Pilot Plumbing (F50)

LG493

20011957

29

Image 29
Contents What to do if YOU Smell GAS INSTALLER/CONSUMER Safety InformationTable of Contents Certified To Installation & Operating InstructionsAnsi Z21.50b-2005 / CSA 2.22b-2005 Vented Gas Fireplace Please Review the Following CarefullyStandard Framing Locating Your FireplaceMantels Clearance to CombustiblesFraming and Finishing HearthFinal Finishing Gas SpecificationsGas Inlet and Manifold Pressures Gas Line InstallationHigh Elevations Electrical Junction BoxControl System Control System InstallationChateau Direct Vent Gas Fireplace Special Feature for Cold ClimatesKey Settings Remote Control Transmitter Operating InstructionsIntroduction LCD Liquid Crystal DisplayThermostat Function Manual FunctionSetting LOCK-OUT CP Continuous Pilot FeatureCP Childproof Feature Operational Notes Thermostatic Updating FeatureLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2General Information Assembling Vent Pipes SK8 Venting Pipes Canadian InstallationsUSA Installations Sidewall Applications Horizontal TerminationVertical Termination Step Sidewall InstallationZero clearance sleeve is only required for combustible walls Always install horizontal venting on a level planeHorizontal length requirement Sidewall Installation with Stationary Glass Facing OutsideInstalling the 38S2VDK Door Installation ProcedureRestrictor Plate Installation Flue Restrictor Plate InstallationFlue Restrictor Plate Guide Typical ApplicationsFlue restrictor plate use in straight up installation + 2 + 3 + 4 = Vertical Through-the-Roof InstallationMin Component Description Model Number Chimney ComponentsGlass Cleaning Glass Frame Assembly RemovalCeramic Refractory Installation Clean the glass after the first two weeks of operationDVT38Sw log identification Log, Lava Rock and Ember PlacementLog Pilot Plumbing F50 Overlay is very fragile Log Right Flame Characteristics Trim Installation Turning Off the Gas to the Appliance Lighting & Operating InstructionsLighting Instructions Operation TroubleshootingAmerican Flame Gas Control System Troubleshooting American Flame Gas Control System What to Check American Flame Gas Control System Error CodesFuel Conversion Instructions Conversion PrecautionsConversion Procedure Remove pilot orifice DVT38S2 Injector Orifice Size Matrix Pilot Flame AdjustmentValve Minimum Rate Screw Conversion to LPBurner and Burner Compartment MaintenanceCleaning the Control System DVT38S2 Units GFYW5Q0 DVT38S2 DVT38S2Fuel Conversion Kits Back-up Battery Kit AccessoriesChateau Direct Vent Gas Fireplace Product Covered by this Warranty Limited Lifetime WarrantyModel EnerGuide Ratings Fireplace Efficiency % Efficiency Ratings