14. OPERATING PROCEDURES
n NOTES BEFORE STARTING OPERATION
14. OPERATING PROCEDURES
■NOTES BEFORE STARTING OPERATION
(1)Insert the power plug into the AC outlet and turn the power ON.
(2)A
(3)Do not move the scale while it is in operation. Should it become necessary to move it at any time, turn the power switch to the OFF position and be sure to reajust the level indicator after relocating the scale.
(4)Should a power failure occur during operation, remove the commodity from the platter and insert the power plug into an AC outlet again when power is restored.
(5)If the scale is used with an unrated power source, inaccurate scaling or other errors may occur.
(6)If the zero point has shifted during scaling, and no tare is displayed, adjust the zero point by depressing the ZERO key.
(7)Check the date of the scale before operation every day.
(8)Make a test print before operation every day. Press the TEST key, and the test label is issued.
■How to access the REG., M.DOWN, or REWRAP menu
The following display is the REG. menu display. When this display is shown after pressing the POWER key, you can start the REG. operation right away.
Remote Display
WEIGHT | UNIT PRICE | TOTAL PRICE |
0.000 | P | 000000 |
Liquid Crystal Display
REG
ENTER THE PLU #
To access a menu from other menus, press the ESC. key to show the Main menu and enter the menu No. When the M.DOWN and REWRAP menus are protected, enter the menu No. and then the password.
Liquid Crystal Display
REG. | 1 |
|
|
|
|
MARK DOWN | 2 |
|
|
|
|
REWRAP | 3 |
|
|