Genie Z-80, Z-60 manual Pre-operation Inspection, Fundamentals

Page 12

Operator's Manual

First Edition · Third Printing

 

 

 

 

Pre-operation Inspection

Do Not Operate Unless:

You learn and practice the principles of safe machine operation contained in this operator's manual.

1Avoid hazardous situations.

2Always perform a pre-operation inspection.

Know and understand the pre-operation inspection before going on to the next section.

3Always perform function tests prior to use.

4Inspect the workplace.

5Only use the machine as it was intended.

Fundamentals

It is the responsibility of the operator to perform a pre-operation inspection and routine maintenance.

The pre-operation inspection is a visual inspection performed by the operator prior to each work shift. The inspection is designed to discover if anything is apparently wrong with a machine before the operator performs the function tests.

The pre-operation inspection also serves to determine if routine maintenance procedures are required. Only routine maintenance items specified in this manual may be performed by the operator.

Refer to the list on the next page and check each of the items and locations for modifications, damage or loose or missing parts.

A damaged or modified machine must never be used. If damage or any variation from factory delivered condition is discovered, the machine must be tagged and removed from service.

Repairs to the machine may only be made by a qualified service technician, according to the manufacturer's specifications. After repairs are completed, the operator must perform a pre-operation inspection again before going on to the function tests.

Scheduled maintenance inspections shall be performed by qualified service technicians, according to the manufacturer's specifications and the requirements listed in the responsibilities manual.

10

Genie Z-80/60

Part No. 82258

Image 12
Contents Operator’s Manual Contents Contact usSafety Rules Do Not Operate UnlessElectrocution Hazards Tip-over HazardsSafety Rules Fall Hazards Collision HazardsComponent Damage Hazards Explosion and Fire HazardsDamaged Machine Hazards Bodily Injury HazardDecal Legend Controls Ground Control PanelPlatform Control Panel 2221 Pre-operation Inspection FundamentalsPre-operation Inspection PRE-OPERATION InspectionMaintenance Observe and ObeyCheck the Engine Oil Level Check the Hydraulic Oil Level Deutz F4L 913 Engine Engine oil viscosity requirementsScheduled Maintenance Check the BatteriesCheck the Engine Coolant Level Liquid Cooled Models Function Tests At the Ground ControlsTest Emergency Stop Test the Machine FunctionsTest Auxiliary Controls Test the Tilt SensorTest the Operating Envelope At the Platform Controls Test the Steering models with 4 wheel steer Test the Steering models with 2 wheel steerTest the Drive Enable System Test Drive and BrakingTest the Oscillate Axle Oscillating axle-equipped models Test Limited Drive Speed Workplace Inspection Workplace InspectionOperating Instructions Starting the EngineEmergency Stop Only use the machine as it was intendedAuxiliary Controls Operation from GroundOperation from Platform Drive Enable Engine Idle Select rpmTo Drive Regulated Generator if equippedOperating Envelope Indicator Lights Check Engine LightStopping the Engine After Each UseDecals Decal InspectionDecals Free-wheel Configuration for Winching Transport and Lifting InstructionsSecuring to Truck or Trailer for Transit Securing the ChassisSecuring the Platform Lifting Instructions Turntable Chassis Lifting Point PointsSpecifications 80/6080/60 Range of Motion +34