Genie GR-12, GR-15, GR-20 manual Pre-operation Inspection, Fundamentals

Page 14

Operator's Manual

Third Edition • Second Printing

 

 

 

 

Pre-operation Inspection

Do Not Operate Unless:

You learn and practice the principles of safe machine operation contained in this operator's manual.

1Avoid hazardous situations.

2Always perform a pre-operation inspection.

Know and understand the pre-operation inspection before going on to the next section.

3Always perform function tests prior to use.

4Inspect the workplace.

5Only use the machine as it was intended.

Fundamentals

It is the responsibility of the operator to perform a pre-operation inspection and routine maintenance.

The pre-operation inspection is a visual inspection performed by the operator prior to each work shift. The inspection is designed to discover if anything is apparently wrong with a machine before the operator performs the function tests.

The pre-operation inspection also serves to determine if routine maintenance procedures are required. Only routine maintenance items specified in this manual may be performed by the operator.

Refer to the list on the next page and check each of the items.

If damage or any unauthorized variation from factory delivered condition is discovered, the machine must be tagged and removed from service.

Repairs to the machine may only be made by a qualified service technician, according to the manufacturer's specifications. After repairs are completed, the operator must perform a pre-operation inspection again before going on to the function tests.

Scheduled maintenance inspections shall be performed by qualified service technicians, according to the manufacturer's specifications and the requirements listed in the responsibilities manual.

12

GR-12GR-15GR-20

Part No. 97779

Image 14
Contents Operator’s Manual Contents Contact usSafety Rules Do Not Operate UnlessStock Picker platform Electrocution HazardsMaximum capacity GR-12 and GR-15 Standard platform AWP and fiberglass platformMaximum side slope rating Stowed position Maximum capacity GR-20 Standard platformMaximum slope rating, stowed position Maximum allowable manual force Fall Hazards Collision HazardsExplosion and Fire Hazard Crushing HazardComponent Damage Hazard Damaged Machine HazardsTip-over Hazard Battery Safety Burn HazardsExplosion Hazards Lifting HazardDecal Legend Page Controls Platform ControlsGround Control Panel Pre-operation Inspection FundamentalsPre-operation Inspection PRE-OPERATION InspectionHydraulic oil specifications MaintenanceMaintenance Symbols Legend Observe and ObeyScheduled Maintenance Check the BatteriesFunction Tests At the Ground Controls At the Platform ControlsTest the Tilt Sensor Operation Test the SteeringTest Drive and Braking Test Limited Drive Speed Test the Pothole GuardsWorkplace Inspection Workplace InspectionOperating Instructions Only use the machine as it was intendedOperation From Ground Emergency StopAuxiliary Lowering Operation From PlatformTo Reduce Drive Speed Driving on a slopeTo Extend and Retract Platform if equipped Error Indicator displayBattery Level Indicator Operation From Ground with ControllerTo Charge Batteries Battery and Charger Instructions Observe and ObeyMaintenance free batteries Standard BatteriesTransport and Lifting Instructions Brake Release OperationSecuring the Chassis Loading the Machine With a CraneSecuring to Truck or Trailer for Transit Decals Description QuantityDecals Inspection for Decals with Symbols Stock Picker Platform Decals Drive speeds SpecificationsGR-12 Floor loading informationSpecifications GR-15GR-20 Platform dimensions, all models length x width Genie Scandinavia