
SpectraLink Corporation | Link WTS Installation and Operation |
This table lists the installation steps and the person usually responsible for each step.
ü | Task | Wire |
| System | |
Description | Contractor | Installer | Admin | ||
| |||||
|
|
|
|
| |
| Site Preparation |
|
|
| |
|
|
|
|
| |
| Determine Location of MCU |
|
| ü | |
|
|
|
| ||
|
|
|
|
| |
| Run Cable for System |
|
|
| |
|
|
|
|
| |
| Run Cable to Base Station Locations | ü |
|
| |
|
|
|
| ||
|
|
|
|
| |
| Pull Cable | ü |
|
| |
|
|
|
| ||
|
|
|
|
| |
| Terminate Cable at Base Station Locations | ü |
|
| |
|
|
|
| ||
|
|
|
|
| |
| Prepare and Install Demarc Blocks | ü |
|
| |
|
|
|
| ||
|
|
|
|
| |
| Assign and Program Ports |
|
| ü | |
|
|
|
| ||
|
|
|
|
| |
| Connect Cables to Demarc Blocks | ü |
|
| |
|
|
|
| ||
|
|
|
|
| |
| Install SpectraLink System |
|
|
| |
|
|
|
|
| |
| Survey Site and Check Components |
| ü |
| |
|
|
|
| ||
|
|
|
|
| |
| Install MCUs |
| ü |
| |
|
|
|
| ||
|
|
|
|
| |
| Install Base Stations |
| ü |
| |
|
|
|
| ||
|
|
|
|
| |
| Install Outdoor Base Stations | ü |
|
| |
|
|
|
| ||
|
|
|
|
| |
| Connect and Register Wireless |
| ü |
| |
|
|
|
| ||
| Telephones |
|
|
| |
|
|
|
|
| |
| Set Up Diagnostic Modem |
| ü |
| |
|
|
|
| ||
|
|
|
|
| |
| Register Wireless Telephones |
| ü |
| |
|
|
|
| ||
|
|
|
|
| |
| Program Wireless Telephone Features |
|
| ü | |
|
|
|
| ||
|
|
|
|
| |
| Test Wireless Telephones |
| ü |
| |
|
|
|
| ||
|
|
|
|
| |
| Site Certification |
| ü |
| |
|
|
|
| ||
|
|
|
|
|
Part Number: | Page 2 |